April 2004 Monthly Operating Report for Perry, Unit 1
ML041410295
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 05/14/2004
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PY-CEI/NRR-2802L
Download: ML041410295 (3)


Text

FENOC Perry Nuclear Power Plant "ff 10 Center Road P0. Box 97 FirstEnergy Nuclear Operating Company PO.

Bo 97 May 14,2004 PY-CEI/NRR-2802L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the April 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki

_Manager --Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

..A;l,, -'.,............................................

.',.a,

r

{q'

Ae

~~~~~~

a

.;k Zt'; 't';s

s. t'.

.j,,

j v 2- ; -2...............
i.

-*N.i, A;..;},

?

I; r

I'

{ ';.

eL.'

',;j

.,!:: f,:',j..-

i o

.*;l

-;./

r.-;*I;t^

{

T-X T,

(!

h 1;

OPERATING DATA REPORT UNIT:

Perry DATE:

5/11104

1.

Docket: 50-440

2.

Unit Name:

Perry Nuclear Power Plant

3.

Reporting Period: April 2004

4.

Utility

Contact:

T. Phelos

5.

Telephone: 440-280-7660

6.

Design Electrical Rating (Net MWe):

1260

7.

Maximum Dependable Capacity (Net MWe):

1235 This Month Yr-to-Date Cumulative

8.

Hours Reactor was Critical 719.0 2,903.0 115,147.7

9.

Hours Generator On-Line 719.0 2.903.0 112,414.3

10.

Unit Reserve Shutdown Hours 0.0 0.0 0.0

11.

Net Electrical Energy (MWeH) 900.902.0 3.597.334.0 128.725.746.0 Page 1

I.

k 0

I UNIT SHUTDOWNS REPORT MONTH - APRIL 2004 DOCKET NO: 50-440 NAME:lPerry Nuclear Power Plant DATE: 15/11/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action loPrevent Recurrence I

Hours 2

3

SUMMARY

The Perry Plant was on line the entire month of April.

tJ.-.

1. TYPE:

2.

F: Forced S: Scheduled REASON:

A-Equipment Failure (explair B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

License Examination F - Administrative G - Operational Error (explain)

H - Other (explain) ins I

3. METHOD:

I - Manual 2-Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2