FENOC Perry Nuclear Power Plant "ff 10 Center Road P0. Box 97 FirstEnergy Nuclear Operating Company PO.
Bo 97 May 14,2004 PY-CEI/NRR-2802L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the April 2004 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki
_Manager --Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
..A;l,, -'.,............................................
.',.a,
- r
{q'
- Ae
~~~~~~
a
.;k Zt'; 't';s
- s. t'.
.j,,
- j v 2- ; -2...............
- i.
-*N.i, A;..;},
?
I; r
I'
{ ';.
eL.'
',;j
.,!:: f,:',j..-
i o
.*;l
-;./
r.-;*I;t^
{
T-X T,
(!
h 1;
OPERATING DATA REPORT UNIT:
Perry DATE:
5/11104
- 1.
Docket: 50-440
- 2.
Unit Name:
Perry Nuclear Power Plant
- 3.
Reporting Period: April 2004
- 4.
Utility
Contact:
T. Phelos
- 5.
Telephone: 440-280-7660
- 6.
Design Electrical Rating (Net MWe):
1260
- 7.
Maximum Dependable Capacity (Net MWe):
1235 This Month Yr-to-Date Cumulative
- 8.
Hours Reactor was Critical 719.0 2,903.0 115,147.7
- 9.
Hours Generator On-Line 719.0 2.903.0 112,414.3
- 10.
Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 11.
Net Electrical Energy (MWeH) 900.902.0 3.597.334.0 128.725.746.0 Page 1
I.
k 0
I UNIT SHUTDOWNS REPORT MONTH - APRIL 2004 DOCKET NO: 50-440 NAME:lPerry Nuclear Power Plant DATE: 15/11/04 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action loPrevent Recurrence I
Hours 2
3
SUMMARY
- The Perry Plant was on line the entire month of April.
tJ.-.
- 1. TYPE:
2.
F: Forced S: Scheduled REASON:
A-Equipment Failure (explair B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H - Other (explain) ins I
- 3. METHOD:
I - Manual 2-Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2