ML041410147

From kanterella
Jump to navigation Jump to search
E-mailed on 04/30/04 ANO 1 - RAI for Relief Request R&R-005&006
ML041410147
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/30/2004
From: Alexion T
NRC/NRR/DLPM/LPD4
To: Davant G
Entergy Operations
Alexion T W, NRR/DLPM, 415-1326
References
Download: ML041410147 (3)


Text

Thomas AlexonI-FOR RELIEF REQUEST R&R-4 5I0I--

Page 1

I[Thomas Alexion - RAI FOR RELIEF REQUEST R&R-005&006 Page 1 From:

To:

Date:

Subject:

Thomas Alexion DAVANT, GUY H 4/30/04 11:52AM RAI FOR RELIEF REQUEST R&R-005&006

Guy, See the attached.

Tom CC:

SBENNE2@entergy.com

CA.W1ND0W!S\\TEMP\\qW}0091..TMP CMJPage 1 I Mail Envelope Properties (40927648.65B : 0: 20628)

Subject:

Creation Date:

From:

Created By:

RAI FOR RELIEF REQUEST R&R-005&006 4/30/04 11:52AM Thomas Alexion TNVA@nrc.gov Recipients entergy.com GDAVANT (DAVANT, GUY H)

SBENNE2 CC (SBENNE2@entergy.com)

Action Transferred Date & Time 04/30/04 11:57AM Post Office Delivered Route entergy.com Files R&R005&6RA1043004.wpd MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 3437 655 Date & Time 04/30/04 11:19AM 04/30/04 11:52AM No None Yes Standard No None No Standard Immediate Delivered & Opened

REQUEST FOR ADDITIONAL INFORMATION (REVISED 04/30/04)

RELIEF REQUEST R&R-005 AND R&R-006 ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1)

1.

Describe briefly the latest technical basis in support of Relief Request R&R-006, including the following items:

1 a.

Methodology - Discuss the steps of elastic plastic fracture mechanics (EPFM) approach; discuss the applicability of the EPFM for the ferritic reactor vessel head material in the flaw evaluation; and provide references.

1 b.

Assumptions - Discuss flaw size, flaw path; the applicability of the upper shelf energy value used for the ANO-1 reactor vessel head; and provide references.

1 c.

Results - Discuss the preliminary results in terms of safety factors, J applied, and J material values; and flaw growth.

1 d.

Preliminary Conclusion - Entergy needs to make a preliminary conclusion regarding whether the postulated flaw in the J-groove weld remnant will affect the structural integrity of the ANO-1 reactor vessel head.

2.

Entergy needs to make a preliminary conclusion regarding whether the nozzle repair proposed in Relief Requests R&R-005 and -006 will affect the reactor vessel head in maintaining the structural integrity and leakage integrity of the reactor coolant system.

3.

Entergy needs to commit to submit its final technical basis, including the flaw evaluation, by a certain date. Entergy had proposed June 1, 2004, in its April 12, 2004 submittal.