Oconee Nuclear Site NRC Interface Meeting May 10, 2004 C.,
CD C+'
Duke VEnergy.
Underlying Foundation
- Oconee and NRC working together for nuclear safety built on a foundation of:
- Mutual trust and respect
- Open communication
- Clarity of requirements and expectations
- Consideration of priorities
- Predictable results 2
Duke VEnergy.
Oconee Timeline Overview
- Oconee PRA Development
- Early 90's Emergency Power Study
- Mid-90's Safety-related Classification Project 1998; MOG ongoing, Design Basis Group formed, Priorities Understood and Aligned
- 1 1-2-98
- License Renewal and Significant Plant Upgrade
- NRC Transition to ROP 3
.0
, Duke IEnergy.
Summary Of Interactions
- ROP Items
- EFW design Tornado
-AB Flood
- CR Habitability
-AB Cooling
-SSF
-AB Flood
- CR Habitability/AST
-Keowee
- QA classifications 4
Duke V Energys Barriers To Success
- Oconee Design
- Non-SRP, LBLOCA bounding
- Minimal historical interest in non-Ch events 15 external
- Analysis and documentation rigor much 15 scenarios less than Ch
- SERs did not document entire NRC review and approval
- NRC change from deterministic to risk-based 5
e.
Duke V Energys Barriers To Success
- Absence of approved RCP seal model
- Staff/inspector discomfort with ONS original design
- Competing and/or misunderstood priorities
- Absence of predictable outcomes
- Reluctance to accept engineering judgment 6