ML041400372

From kanterella
Jump to navigation Jump to search
Draft Outlines
ML041400372
Person / Time
Site: Indian Point 
Issue date: 04/20/2004
From: Christman R
Entergy Nuclear Northeast
To: Conte R
NRC/RGN-I/DRS/OSB
Conte R
References
50-286/04-301
Download: ML041400372 (1)


Text

ES-301 Administrative ToDics Outline Facility:

Indian Point 3 Date of Examination:

4/3/2004 Examination Level:

SRO RETAKE Operating Test Number:

1 Conduct of Operations Conduct of Operations I

Description A. I New 21 3 A.2 NEW 214 A.3 NEW 215 JPM-JPM-JPM-A.4 Modified.

216 A.5 JPM-NEW 217 JPM-Equipment Control Radiation Control Emergency Plan Describe method of evaluation:

5 Admin JPMs WA 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (3.7/4.4)

JPM:

Perform a Quadrant Power Tilt Ratio Calculation per SOP-RPC-005A WA 2. I

.8 Ability to coordinate personnel activities outside the control room. (3.8/3.6)

JPM:

Perform Subsequent Action Steps of 3-AOP-SSD-1 as CRS WA. 2.2.14 -Knowledge of process for making configuration control changes. (2.1/3.0)

JPM:

Perform an Independent Valve Lineup Verification for COL-SI-1 Section 2.2, Vacco Filter Room WA.-2.3.6. Knowledge for the requirement for reviewing and approving release permits. (2.113.1)

JPM-Approve liquid release for 32 Monitor Tank WA 2.4.41 Knowledge of the emergency action level thresholds and WA 2.4.44-Knowledge of emergency plan protective action classifications. (2.4/4.1) recommendations (2.114.0)

JPM:

Classify the event and make initial notifications Last NRC had GE and PARS.

New Procedure/Form since last exam Form ES-301-1 SRO ADM Outline NUREG-1021, Revision 8