ML041400372
| ML041400372 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 04/20/2004 |
| From: | Christman R Entergy Nuclear Northeast |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-286/04-301 | |
| Download: ML041400372 (1) | |
Text
ES-301 Administrative ToDics Outline Facility:
Indian Point 3 Date of Examination:
4/3/2004 Examination Level:
SRO RETAKE Operating Test Number:
1 Conduct of Operations Conduct of Operations I
Description A. I New 21 3 A.2 NEW 214 A.3 NEW 215 JPM-JPM-JPM-A.4 Modified.
216 A.5 JPM-NEW 217 JPM-Equipment Control Radiation Control Emergency Plan Describe method of evaluation:
5 Admin JPMs WA 2.1.7 Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (3.7/4.4)
JPM:
Perform a Quadrant Power Tilt Ratio Calculation per SOP-RPC-005A WA 2. I
.8 Ability to coordinate personnel activities outside the control room. (3.8/3.6)
JPM:
Perform Subsequent Action Steps of 3-AOP-SSD-1 as CRS WA. 2.2.14 -Knowledge of process for making configuration control changes. (2.1/3.0)
JPM:
Perform an Independent Valve Lineup Verification for COL-SI-1 Section 2.2, Vacco Filter Room WA.-2.3.6. Knowledge for the requirement for reviewing and approving release permits. (2.113.1)
JPM-Approve liquid release for 32 Monitor Tank WA 2.4.41 Knowledge of the emergency action level thresholds and WA 2.4.44-Knowledge of emergency plan protective action classifications. (2.4/4.1) recommendations (2.114.0)
JPM:
Classify the event and make initial notifications Last NRC had GE and PARS.
New Procedure/Form since last exam Form ES-301-1 SRO ADM Outline NUREG-1021, Revision 8