Fire Protection Manual Action Discrepancies
ML041400105
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/18/2003
From:
NRC/OCIO
To:
References
FOIA/PA-2003-0358
Download: ML041400105 (10)


Text

- - - - - .- . .. &&III Sak8SA69t' L.SI lu~lw i nit nv- icicave-r-ful r. u Pago I 1 Printedt 02/19/03 ACTIDN RLQUEST 000G9721 Type  : NCR Orig Datoa 09/23/02 14t49 Diseovery Datat Subjaet  : FIRE PROTECTION MANUAL ACTION DISCREPANCIES Descriptios BASED UPON NEW INFORMATION RCELIVED PURING A TELR HONE CALL OX AUG. 23, THE REG.NGGC-O010 RVIEW FOR EC APPEARST 4:

'O IE INADEQUATE. LICENSUS P.QUTINELY CREDIT MAHNUAL ACTIONS IN SAFE SlHUTDOWN STRATEGIES FOR FIRE. IN LhTE 2001. NRC I NSPECTORS EEGAN CHALLEOTNQ THAT PRACTICE. 'TH2 INDUSTRY CH ALLE24GED WHAT APMARED TO BE CHANGING POLICY WITHOUT' RULENA ICING . THE MIE ISNORTATION RVE=XE THAT C&ULDIT FOR MaY MAN UAL ACTION RQUIRES PRIOR NRC APPROVAtL. NP PLANNED TO EUB HIT THE DV'IATION REQUEST_ F0A MANUAL ACTIC AND AT :

IN ADDITION, OTI1ER. ACTIONS M AY WEvD TO BE EVALUATED PNDING ' NRC RESOLTION OF THE M ANUAL ACTION ISSUE.

PriorIty  : 2 Report To Status: APPROVED 08/27/02 S

D~ue Date  : 00/27/03 Event Origiator: CAVESJ Originator Group:

Facility  : RNP Depcrtment s TAY Oganizationi Owed To  : Owed To Group s FSSUEVAL OCad To Fac: I12P Departmnt I Discipline

    • ~~ j :~ Ii (i fl ri~o mation as

@ @ 4 of -w 4 4 a A". A-0

  • 5 d.JS-I, wJ l I vt Page I S Printed: 02/18/03 F . IACTION REQUEST 00069721 SUE Type IWNV Du~e Date i 09/22/02 S~a tus CO?4PLE TE Roschs4fale I Pri Rasp Group:

Assismed To : C amQa F.9S1ON See Rasp Group:.

subject  : ADVhERS E COMMhTZN INVESTIGATrON 74ff Facility: HNF Unit 2 ya teni I UCAI Schodula Sft Organimation: Department  : MCP Disciplina Es~t ManhrA Bit Comp Data z AxsLOM2Zant ALttzibute Value 3Leqd~Dat a

2. EVALLYATOVIABSIGUEE Name I Value mReqd Dati D 1A COMKITTED J~saig=&=t, attzibtge Va~lue Raaq! Dati 1IJ CYOME BASIS NaTfme i ValUe Eeq~d ?aOt, I 2 MISCMLLANzous N NaZnQ I ia~5.i~mntAtitl;bUte Value l~eqj Date 2A COWMEMS K Jacaigmnant Zxt~ribute Value Ratqd Date 25 COMENTS x A524=ni8nit 3.tbribute Valu~e Rwe Date c 2C COI4HLNTS N N~amQ I AS61wza~t. Attribute Valise xeqd Date 212 CO~MEITI'S N

AsI.= nrt Attribute v'Alue 2Z~COMMMhT.5 N

CONPLP-TION NOTES cAUsE/kCTzOu IASSIOWN2T COMPLVTZO:4 APPROVAL

Page  : 7 Frintedi 02/11803 ACTION REQUE.ST 00069721 I

ASSIG1MNT NONER 05 ISU

'rypQ CORR~ Due Data 01/061'03 Stat~us COHPL~eT Re~schedule I1 in RASp Group I Aszivned T+/-o aXK~wMNm Sec R~onp Group i SubiOct PERFORM & DOCUMENT A FEASIBILITY EVALUATON UCR I Sched~ule Zaf Organization a Department I XCF Discipline Est Kanrshr . st Comip Date a

?LBsigfment Attribute vau eqd Data I.UNITT/SECT LE'ALVATA N llama I Ass fl=6nt 1.ttnibute Value Reqt Date 1A COnfTTED N Naune I ussicrmant -attribute value Reqd Date 1D CHANUE BASIS EXTEND 'IV 1/6/03 N 12/02/02.

1'aanc a.J ZWNZMAN EXTkNID TO 1 /6/03 Dt3k TO NIED TO COM4PLETE EC LIN SUPPORT OF TIME 4:-

NRC TPIEN1qIPTJk FIRE 1'ROTECTTON 3WSPECTflOzq CONC BY PALFULPORD.

Azgiguzwnt YAttribute Value Reqd Daet 2 MISCiELLANZIOU5 N Usisrzant Attribute value aeqt Date 2A COWM.ENTS N Xa5Bgnranzt Attrbute value £eqd 2! COW4ENTS w kssig~amezxt Attribute Value zeaq Date 2C COMMENTS N Naine Assig- azt attribute Value Reqa Date 2D CO?01ENTS N4 Assignmaet Attribute Value Neqd Date 2E CO14MIONTS N DhIaane AssLgnmiert 2attrLbuatg Value Ieqd Date 3A LTCA A.PPROVALL K

FEB-19-03 WED 06:05 PH HNP ADMIN/LIC/NAS FAX NO. 19193622701 P. GI ATTACHMENT 7 Sheet I of 1 Adverse Condition Investigation Form Form CAP-NCOC-0200-7-5 Action Reqjuest Number: 69721-02 Event Date: 8/23/02 Facility: HNP Event Time: 14:49 Unit: 1 Investigator; Chris Georgeson

1. Event Description Bascd upon new information received duringa telephone call on Aug. 23, the REt r-NGGC-0010 review for J:C ippears to be Inadequate. Licensecs routinely credit m inual 4 actions in safe shutdown stratcgies ror fire. In late 2001, NRC inspectors began cl allenging that practice. Thc industry challenged what appearml to be changing policy witho;it rule making. 'ihe new information rcvealedL that credit for any manual action requires Prior NRC approval. HNP planned to submit the deviation request for manual actions and th; .taction rcnmlns appropriate. In addition, other manual actions may need to be evaluated I ending the NRC resolution of the manual action issue.
2. InvesligatIon Results An internal NRC safe shutdown J fire protection program manual actions guidanc( document issued on 11/14/01 Indican that the use of manual actions In lieu of separation oi protection of equipment required for safe shutdown in casc of lire requires prior NRC appro%at.

Tricnnial NRC fire protection inspection leamns began issuing violations to utilities over this issue in late 2001 and early 2002. More recpnt Instecions have generated unrcsolved Items (UR1s) pending further NRR guidance. EC as prepared and implemcnted Io resolvce a degraded fire barrier NRC violation (white finding). The violation regards the tf crmo-lag

-> fire barrier in th icorn which was determined to be of an indeterminate fire iating. The modification inatiled a qualified 3-houjrfier barer to protec safe shutd twn Division I om fire. There Is no dispute concernin;: the eflecivencss of this modification. iiowvcer, the installation of the new firo barrie created a now firi area that consists of the Om which is now separated from th room. A new safe shutdown.annalyfls was prepared for this new fire area. and, sinc. the

___w !onl

- *f1 og actions were specified to implement the optimum safe shutdown strategy. These n lanuil actions wore specifiod to prevent possible spurious operations of equipment cause( . byr '

orm interfcring with safe shutdown operations as describec in GL 81-12 clarifications. The 50.59 prepard for the EC screened the change out from 50. i9 review because the full scope of the modification is evaluated under the fire protcction pr gram change attachmnanm. 8This was appropriate and meets the current procedure requirer ients of REG-NGGC-00 10. The rime protection program change evaluation concluded that the modification did not adversely affect the ability to achieve and maintain safe shutd )wn in the event of a fire as described under license condition 2F, and therefore prior NRC re'iew and approval was not required. The concern now is that: Since the EC includes manua actions, nnd the current NRC position is that manual actions require prior review and apprc val, then the fite protLection program change evaluation may need to be revised to indicate tl, at prior NRC ryiew and approval is requircd and the EC must then be submitted to the Ni .C.

However, It is still unclear in recent discussions with the NRC if the manual action; can be uccepted byHNP under license condition 2F or if a deviation request needs to be 6 tbmitted.

In addition, tho NRC will not close the associated lire barrier violation until the mt nuni actions air either reviewed and approved by the NRC or new guidance concerning -he

  • FEB-19-03 WED 06'06 PN HNP ADIIIH/IC/INAS FAX NO. 19193622701 P. 0!,

acceptability of manual actions is distributed by NRR ullowing I1NP to accept the manual actions under license condition 2F.

As a result of the above regulatory activity, an industry Issue has also been raised egarding plant safe shutdown in case of fire analyses that credit operator actions outside of he main control room (manual pctions) In lieu of separation or protectlion or redundant saf: shutdown equipment (includingJ The industry, through NEf, has presented a posiliol to the NRC that manual actions are acceptable, as used throughout the industry and as d(scribed in Generic Letter 81-12 clarifications, as long as Lhese actions ae shown to be feasible. The NRC has agreed to change the fire protection rule and is preparing further guildanc 3 on the issue for usc by the Inspection tcams, The rule change and further guidance is exr ected to include requirements concerning how to show that manual actions are feasible, N IC and NEI information concerning feasibility evaluation methods is available. Jn order I ,r Hamis plant to achieve closurc of the violation regarding thc degraded T-lag firc barrierr I theI room it Is necessary to perform and document a feasibility evaluation for lhemroom fiii

  • area manual actions specified by EC10 and revise the EC to Include the .easit ility information as well as any change to the REG-NGGC-0010 evaluation.

Depending on the results of Industry and NRC activity surrounding this issue, feas ibility cvaluations may also be needed for manual actions currently specified for other H 4P firc areas ora bounding feasibility evaluation for the most limiting fire area that credit imanual actions.

3. Apparent Cause(s) (Number each cause and refercnco the number in section 6 bc ow) 3.1 The apparent cause of the manual actions issue and the conclusions renchcd Ir the EC 48802 REG-NGGC-0010 evaluation is a change In interpretation of the fire protec tion regulations by the NRC concerning the use of manual actions for safe shutdown, ;nd unccrtainty at HNP concerning how the use of manual actions should be evaluated against license condition 21 when making changes to the plant fire protection program. It is still uncertain If prior approval of manual actions by the NRC is required in order to co mply with license condition 2F.
4. Does this ovent involve a losq of a Maintenance Rule function? [JYes j No (If yc.,contact System Engineer. Contact Maintenance Rule Engineer for assistance If needed.)
5. Do you rccommcnd Lhis event be disseminated as sn Operating Experience (E' i'rogram) eniry? (Rcfcr to CAP-NGGC-0202 Atutchmcnt 6 for guidance; If yes, contact the 1ppropriate QE Program Coordinator)

DYes Z No

rLD-10-uW WtV UO;u1 rn HNr H WL~INLUMSN FAX NO. 19193622701 P. 01;

6. Conrcive Actions Plaxine(lCompleted Assignmnen Assigne! Initial CIA # Cause Corrective Action lType or Due

_ { l z.rawnl Date I~- I 1 3.1 Pcrform and document a CORR John 12/11102 feasibility evaluation for the Kunzman:,

awoom firc area rnanual / EM&C actions specified by ECE88021 Design and revise thc EC to include ihe feasibility informnation as well as any change to thc REG-NGGC-0010 evalualion, 2 3.1 Depending on the results of CORR John 12/18102 Industry and NRC activity' Kunzm anit surrounding tho SSD manual acLions issuc: Determine if Design feasibility evaluations for SSD manual actions ar: roquired in addi don to the room evaluation or thsis

. v . v WV, WV' U.w V II II 11a 1 1Zi111LTf LLVI JInL r nn llU, 1 ia 1ZJul UI r. U AR 00069721 - - Perform and document a feasibii evaluation fi irthe 0 ooin fire area manual actions specified by E }nd revise thc EC to include the feasibility information as well as any change to the RE(C -

NGCC-0010 cvaluation. - - -

RESPONSE

A manual action feasibility study was completed for the manual actior s rcquired as a result of a fire in the [CP7Room. The results of the feas. bility study and a summnary of the manual actions are contained in E C AttachmentindIlespectively.

A rcview of the REG-NGGC-OOl( evaluation for E was conducted and no changes to the evaluation was required as a result of tie manual action feasibility study.

AR 00069721 -- Depending on the results of industry and NRC activity surrounding the SSD manual actions issue: Detemilne if feasibility evaluations for SSD manual actions are required in addition to th 22-room evaluation of this AR. - - -

RESPONSE

Based on results of NRC Trienniel Fire Protection Inspection, feasibility evaluations for required SSD manual actions are prudent and will be pciformed. A schedule for completion shall be developed for each firn area.

Assign an action item to John Kunzmann with a due date of 516/03.

ILU Ii u v IA.. %Ow -

AR 00069721 -- Based on results of NRC Trienniel Fire Protection Inspection, feasibility evaluations for required SSD maiual actions a c prudent and will be performed. A schedule for completion shall be developed for each fire area. - - -

RESPONSE

.^ FEB-19-03 WED 06:09 PM HNP ADMIN/LIC/NAS FAX NO. 19193622701 P. 0'/02 1.

Englneering Change Print Date: 02/18/03 EC Nutnber  : 0000048802 001 Facility  : RNP l

rype/Sub-type: PCHG DESG

'I

  • Page: I Attributes Xttribute Sub-categorY3 EC ATTUB Attribute Name value Pas;Port Date 8C IS READY FOR CLOSURE? GEORGC 07/02/02 THIS EC R!ESOLVES AN NRC VIOLATION AND HAS BEEN SUBMITTED TO TIE N RC FOR REV IEW AND CONCURRENCE PRIOR TO CLOSURE. DO NOT vOSE THIS EC UNzTL IT HAS BE EN CONFIRMUED WITi LICENSING THAT NRC REVIEW tS COMPLETE AND CONCURRENCE BEEN RECEIVIE:D.
1. QUALITY CLASSIFICATION A . GEORGC 05/09(02
2. IS TURNOVER REQUIRED? Y/N Y GEORGC *05/09/02
3. EC IS READY FOR T/O TO OPS? GEORGC 02/13/03 TURNOVER MAY NOT PROCEED UNTIL REGULATORY ISSUES REGARDING COMpPLIACE WITH XUREG 0800 SECTION 9.5.1 DESCRIBED IN THE DEC. 2002 FP/SSD NRC USPECTION R . .R.

RE RESOLVED.