2003-04 Annual Assessment Follow-up Letter - Peach Bottom Atomic Power Station, Unit 2
ML041250024
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/30/2004
From: Blough A
Division Reactor Projects I
To: Crane C
Exelon Generation Co, Exelon Nuclear
Shared Package
ML040620014 List:
References
Download: ML041250024 (4)


Text

April 30, 2004 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER - PEACH BOTTOM ATOMIC POWER STATION, UNIT 2

Dear Mr. Skolds:

On April 22, 2004, the NRC Staff completed a quarterly review of the safety performance of Peach Bottom Atomic Power Station Unit 2. The review evaluated performance indicators and inspection results. The purpose of this letter is to inform you of your safety performance during this period and our plans for a future inspection at your facility.

Our review of Peach Bottom Unit 2 identified that one of the plant performance indicators has crossed the threshold from Green to White for the Unplanned Scrams per 7000 Critical Hours performance indicator. For the first Quarter 2004, the numerical value of the performance indicator for Unit 2 was 3.3, which resulted in this performance indicator changing from Green to White. In the previous four calendar quarters, Unit 2 has experienced four unplanned reactor scrams from power. We also note that this performance indicator was White in the third Quarter 2003. Further, in our annual assessment letter dated March 3, 2004, we identified a substantive cross-cutting issue at Peach Bottom in the area of problem identification and resolution involving inadequate corrective action for known equipment problems. The continued challenge to plant operations as evidenced by the number of unplanned Unit 2 scrams and the equipment reliability issues highlight a need for Exelon to improve plant performance and material condition at the Peach Bottom facility.

As a result of the White performance indicator we have assessed Peach Bottom Unit 2 performance and determined that Unit 2 will remain in the Regulatory Response column of the NRCs Action Matrix. Unit 2 was already in the Regulatory Response column of the NRCs action matrix as a result of a White finding in the Mitigating Systems cornerstone.

We plan to conduct a supplemental inspection, on the White performance indicator, in accordance with Inspection Procedure 95001. This one inspection will cover both instances that the Unplanned Scrams per 7000 Critical Hours performance indicator changed from Green to White. This inspection procedure is conducted to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.

Mr. John L. Skolds 2

Please inform Mohamed Shanbaky of my staff, within 20 days of receipt of this letter, of your schedule for completing any evaluations of the issues that led to this White performance indicator. We will use this information to schedule our inspection at an appropriate time mutually convenient to both parties.

In accordance with 10 CFR 2.790 of the NRCs "Rules and Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Mohamed Shanbaky at 610-337-5209 with any questions you may have regarding this letter.

Sincerely,

/RA/

A. Randolph Blough, Director Division of Reactor Projects Docket Nos.: 50-277 License Nos.: DPR-44

Mr. John L. Skolds 3

cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President, Peach Bottom Atomic Power Station Plant Manager, Peach Bottom Atomic Power Station Regulatory Assurance Manager - Peach Bottom Senior Vice President, Nuclear Services Vice President, Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director, Licensing, Exelon Generation Company, LLC Manager, Licensing - Limerick and Peach Bottom Vice President, General Counsel and Secretary T. ONeill, Associate General Counsel, Exelon Generation Company Correspondence Control Desk Manager License Renewal D. Quinlan, Manager, Financial Control, PSEG R. McLean, Power Plant and Environmental Review Division D. Levin, Acting Secretary of Harford County Council Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams D. Allard, Director, Pennsylvania Bureau of Radiation Protection Director, Nuclear Training TMI - Alert (TMIA)

Board of Supervisors, Peach Bottom Township R. Fletcher, Department of Environment, Radiological Health Program J. Johnsrud, National Energy Committee, Sierra Club Public Service Commission of Maryland, Engineering Division J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)

Commonwealth of Pennsylvania (c/o R. Janati, Chief, Division of Nuclear Safety, Pennsylvania Bureau of Radiation Protection)

State of Maryland

Mr. John L. Skolds 4

Distribution w/encl:

H. Miller, RA/J. Wiggins, DRA (1)

A. Blough, DRP W. Lanning, DRS B. Holian, DRP R. Crlenjak, DRS M. Shanbaky, DRP DRS Branch Chiefs (5)

A. Blamey, DRP L. Cheung, DRS R. Bhatia, DRS R. Nimitz, DRS G. Smith, DRS N. McNamara, DRS D. Screnci, ORA N. Sheehan, ORA C. Smith, DRP - NRC Senior Resident Inspector D. Schroeder, DRP - NRC Resident Inspector J. Jolicoeur, RI EDO Coordinator J. Clifford, NRR G. Wunder, PM, NRR S. Wall, PM, NRR (Backup)

Region I Docket Room (with concurrences)

DOCUMENT NAME: G:\\BRANCH4\\Peach Bottom\\PB Unit 2Followup Assessment Letter_1Q2004.wpd After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME ABlamey/ab MShanbaky/MS ABlough/AB DATE 04/28/04 04/29/04 04/30/04 OFFICIAL RECORD COPY