March 10, 2004 U.S. NUCLEAR REGULATORY COMMISSION No. 04-09 REGION I NOTICE OF LICENSEE MEETING Licensee:
Exelon Generation Company Facility:
Peach Bottom Atomic Power Station Docket Nos.:
50-277; 50-278 Time and Date:
April 14, 2004 at 7:00 p.m.
Location:
Peach Bottom Inn 6085 Delta Road, Delta, PA 17314
Purpose:
The NRC requested an Annual Assessment Meeting with Exelon to discuss the NRCs assessment of the safety performance of the Peach Bottom Atomic Power Station for calendar year 2003. The NRCs assessment is documented in a letter dated March 3, 2004.
Attendees*:
NRC:
A. Randolph Blough, Director Division of Reactor Projects Mohamed Shanbaky, Chief, Projects Branch 4 Craig Smith, Senior Resident Inspector, Peach Bottom Alan Blamey, Senior Project Engineer, Projects Branch 4 Don Florek, Senior Project Engineer, Projects Branch 5 Daniel Schroeder, Resident Inspector, Peach Bottom George Wunder, Project Manager, NRR Licensee:
Robert Braun, VP, Peach Bottom John Stone, Plant Manager Gary Stathes, Engineering Director Public Participation:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC staff following the safety assessment presentation.
NRCs assessment letter and meeting agenda can be found in the ADAMS Meeting package (Accession Number ML040620014). ADAMS is accessible from the NRC Web Site at:
http://www.nrc.gov/reading-rm/adams.html Additional information relative to the NRCs Annual Assessment process and the safety performance of Peach Bottom can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting
Contact:
Dr. Mohamed Shanbaky, Chief Projects Branch 4
2 610-337-5209 E-mail: mms1@nrc.gov Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by April 9, 2004.
/RA/
Approved By:
Mohamed Shanbaky, Chief Projects Branch 4 Division of Reactor Projects
3 Distribution:
Mr. C. Crane, President and CNO, Exelon Generation Company, LLC Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI M. Shanbaky, DRP A. Blamey, DRP C. Smith, SRI - Peach Bottom, DRP D. Schroeder, RI - Peach Bottom, DRP DRP Division Secretary, RI DRS Division Secretary, RI DRM Division Secretary, RI DNMS Division Secretary, RI Region I Receptionist Commonwealth of Pennsylvania
4 Distribution (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
G. Wunder, Project Manager, NRR S. Wall, NRR, (Backup)
W. Lanning, DRS R. Crlenjak, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
K. Farrar, Regional Counsel J. Jolicoeur, RI EDO Coordinator D. Screnci, Senior Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA M. Shanbaky, DRP A. Blamey, DRP G. Matakas, ORA C. Smith, SRI - Peach Bottom, DRP D. Schroeder, RI - Peach Bottom, DRP PMNS WEBWORK DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040700355.wpd. After declaring this document An Official Agency Record it will/will not be released to the Public. To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" =
Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME ABlamey/AB MShanbaky/MS DATE 03/9/04 03/10/04 OFFICIAL RECORD COPY