ML041190215

From kanterella
Jump to navigation Jump to search

4/22/04, TS-Diablo Canyon, Unit 1, Issuance of Amendment 167 & 168, Revision to Technical Specification 3.3.1
ML041190215
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/22/2004
From:
NRC/NRR/DLPM
To:
Shukla G, NRR/DLPM/LPDIV-2/415-8439
Shared Package
ML041180336 List:
References
TAC MB8079, TAC MB8080
Download: ML041190215 (1)


Text

RTS Instrumentation 3.3.1 Table 3.3.1-1 (page 1 of 7)

Reactor Trip System Instrumentation APPLICABLE MODES OR OTHER NOMINAL1a)

SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION CONDITIONS CHANNELS CONDITIONS REQUIREMENTS VALUE SETPOINT

1. Manual 1,2 2 B SR 3.3.1.14 NA NA Reactor Trip 3 (b) 4 (b) 5 (b) 2 C SR 3.3.1.14 NA NA
2. Power Range Neutron Flux
a. High 1,2 4 D SR 3.3.1.1 s 110.2% 109% RTP SR 3.3.1.2 RTP SR 3.3.1.7 SR 3.3.1.11 SR 3.3.1.16
b. Low 1(c)2 4 E SR 3.3.1.1 s 26.2% 25% RTP SR 3.3.1.8 RTP SR 3.3.1.11 SR 3.3.1.16
3. Power Range Neutron Flux Rate
a. High 1.2 4 E SR 3.3.1.7
b. High 1,2 4 E SR 3.3.1.7
4. Intermediate 1tc), 2(d) 2 F,G SR 3.3.1.1
  • 30.6% 25%

Range SR 3.3.1.8 RTP RTP Neutron Flux SR 3.3.1.11 (continued)

(a) A channel is OPERABLE with an actual Trip Setpoint value outside its calibration tolerance band provided the Trip Setpoint value Is conservative with respect to Its associated Allowable Value and the channel Is re-adjusted to within the established calibration tolerance band of the Nominal Trip Setpoint. A Trip Setpolnt may be set more conservative than the Nominal Trip Setpoint as necessary In response to plant conditions.

(b) With Rod Control System capable of rod withdrawal or one or more rods not fully Inserted.

(c) Below the P-10 (Power Range Neutron Flux) Interlocks.

(d) Above the P-6 (Intermediate Range Neutron Flux) Interlocks.

DIABLO CANYON - UNITS 1 & 2 3.3-12 Unit 1 - Amendment No. 435,142,167 Unit 2 - Amendment No. 435,142,168