April 26, 2004 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF AMENDMENT REQUEST (TAC NO. MC1799)

Dear Mr. Kansler:

By application dated January 16, 2004, as supplemented by letter dated February 25, 2004, Entergy Nuclear Operations, Inc. (ENO) applied for an amendment to the Pilgrim Nuclear Power Station (Pilgrim), Facility Operating License No. DPR-35. The proposed amendment requested approval of an engineering evaluation performed in accordance with facility Technical Specification (TS) 3.6.D.3 to justify continued power operation with safety relief valve (SRV) - 3A and SRV - 3D discharge pipe temperatures exceeding 212 degrees Fahrenheit for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as required by TS 3.6.D.4. Subsequently, by letter dated March 26, 2004, ENO withdrew the amendment request based on the repair of the SRVs during the March 22, 2004, Pilgrim outage.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page

April 26, 2004 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

PILGRIM NUCLEAR POWER STATION - WITHDRAWAL OF AMENDMENT REQUEST (TAC NO. MC1799)

Dear Mr. Kansler:

By application dated January 16, 2004, as supplemented by letter dated February 25, 2004, Entergy Nuclear Operations, Inc. (ENO) applied for an amendment to the Pilgrim Nuclear Power Station (Pilgrim), Facility Operating License No. DPR-35. The proposed amendment requested approval of an engineering evaluation performed in accordance with facility Technical Specification (TS) 3.6.D.3 to justify continued power operation with safety relief valve (SRV) - 3A and SRV - 3D discharge pipe temperatures exceeding 212 degrees Fahrenheit for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as required by TS 3.6.D.4. Subsequently, by letter dated March 26, 2004, ENO withdrew the amendment request based on the repair of the SRVs during the March 22, 2004, Pilgrim outage.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC A. Howe R. Junod, RI C. Bixler, RI PDI-2 Reading T. Tate C. Anderson, RI ACRS J. Clifford C. Raynor D. Florek, RI OGC ADAMS Accession Number: ML041110072 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC NAME TTate CRaynor JClifford DATE 4/22/04 4/22/04 4/26/04 OFFICIAL RECORD COPY

Pilgrim Nuclear Power Station cc:

Resident Inspector U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360 Chairman, Board of Selectmen 11 Lincoln Street Plymouth, MA 02360 Chairman, Duxbury Board of Selectmen Town Hall 878 Tremont Street Duxbury, MA 02332 Office of the Commissioner Massachusetts Department of Environmental Protection One Winter Street Boston, MA 02108 Office of the Attorney General One Ashburton Place 20th Floor Boston, MA 02108 Dr. Robert M. Hallisey, Director Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 174 Portland Street Boston, MA 02114 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. John M. Fulton Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Steve Brennion Supt., Regulatory & Industry Affairs Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Mr. Jack Alexander Manager, Reg. Relations and Quality Assurance Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Mr. David F. Tarantino Nuclear Information Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5599 Ms. Jane Perlov Secretary of Public Safety Executive Office of Public Safety One Ashburton Place Boston, MA 02108 Mr. Stephen J. McGrail, Director Attn: James Muckerheide Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Chairman Nuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company P.O. Box 426 Ludlow, MA 01056-0426

Pilgrim Nuclear Power Station cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael A. Balduzzi Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Stephen J. Bethay Director, Nuclear Assessment Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Bryan S. Ford Manager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Mr. Danny L. Pace Vice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Colomb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Senior Resident Inspector U.S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station 600 Rocky Hill Road Mail Stop 66 Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113 Jim Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Kennety L. Graesser 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Ronald Toole 1282 Valley of Lakes Box R-10 Hazelton, PA 18202

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR GENERATION COMPANY ENTERGY NUCLEAR OPERATIONS, INC.

DOCKET NO. 50-293 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission or NRC) has granted the request of Entergy Nuclear Operations, Inc. (ENO or the licensee) to withdraw its January 16, 2004, application for a proposed amendment to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station, located in Plymouth County, Massachusetts. ENO supplemented its application by letter dated February 25, 2004.

The proposed amendment requested approval of an engineering evaluation performed in accordance with facility Technical Specification (TS) 3.6.D.3 to justify continued power operation with safety relief valve (SRV) - 3A and SRV - 3D discharge pipe temperatures exceeding 212 degrees Fahrenheit for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as required by TS 3.6.D.4.

The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on February 17, 2004 (69 FR 7522).

However, by letter dated March 26, 2004, the licensee withdrew the request.

For further details with respect to this action, see the application for amendment dated January 16, 2004, as supplemented by letter dated February 25, 2004, and the licensees letter dated March 26, 2004, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 26th day of April 2004.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Travis L. Tate, Project Manager, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation