ML040920388

From kanterella
Jump to navigation Jump to search

Withdrawal of Request for NRC Approval of Engineering Evaluation of Elevated Safety Relief Valves Discharge Pipe Temperatures
ML040920388
Person / Time
Site: Pilgrim
Issue date: 03/26/2004
From: Bethay S
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.04.032, TAC MC1799
Download: ML040920388 (2)


Text

En a

t v -- En tergy Entergy Nuclear Operations, Inc.

Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 Stephen J. Bethay Director, Nuclear Assessment March 26, 2004 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No.: 50-293 License No.: DPR-35 Withdrawal of Request for NRC Approval of Engineering Evaluation of Elevated Safety Relief Valves' Discharge Pipe Temperatures (TAC No. MC1799)

REFERENCES:

1. Entergy Letter, 2.04.004, Request for NRC Approval of Engineering Evaluation of Elevated Safety Relief Valves' Discharge Pipe Temperatures, dated January 16, 2004
2. Entergy Letter, 2.04.018, Response to Request for Additional Information (TAC No. MC1799), dated February 25, 2004 LETTER NUMBER:

2.04.032

Dear Sir or Madam:

Entergy hereby withdraws the referenced request for NRC approval of engineering evaluation of elevated safety relief valves' discharge pipe temperatures that was submitted in accordance with 10 CFR 50.90 and Pilgrim Station Technical Specification 3.6.D.4. NRC approval is not required since Pilgrim repaired the main steam safety relief valves RV-203-3A and RV-203-3D during the March 22, 2004 outage.

There are no commitments contained in this letter.

Please feel free to contact Bryan Ford, (508) 830-8403, if you have any questions or require additional information.

Sincerely, WGUdm 4~O(

Entergy Nuclear Operations, Inc.

Letter Number: 2.04.032 Pilgrim Nuclear Power Station Page 2 cc:

Mr. Travis Tate, Project Manager Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U.S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19408 Senior NRC Resident Inspector Pilgrim Nuclear Power Station Mr. Robert Walker Radiation Control Program Commonwealth of Massachusetts Executive Offices of Health and Human Services 90 Washington Street Dorchester, MA 02121 Mr. Steve McGrail, Director Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702