Sequoyah Nuclear Plant Annual Assessment Meeting Reactor Oversight Process - CY 2003 Nuclear Regulatory Commission - Region II April 21, 2004
Purpose of Todays Meeting
! A public forum for discussion of the licensees performance
! NRC will address the licensee performance discussed in the annual assessment letter
! Licensee can respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda
! Introduction
! Review of Reactor Oversight Process
! National Summary of Plant Performance
! Discussion of Sequoyah Performance Results
! Licensee Response and Remarks
! NRC Closing Remarks
! NRC available to address public questions
Region II Organization Director Division of Reactor Safety Harold Christensen Deputy Director Charles Casto Scott Shaeffer Robert Carrion Project Engineers Scott Freeman Ross Telson Sequoyah Resident Inspectors Branch Chief Stephen Cahill Director Division of Reactor Projects Len Wert Deputy Director Victor McCree Regional Administrator Loren Plisco Deputy Regional Administrator Luis Reyes
NRC Performance Goals
! Enhance public confidence
! Improve effectiveness, efficiency, and realism of processes and decision making
! Reduce unnecessary regulatory burden PRIMARY GOAL OTHER GOALS MAINTAIN SAFETY AND PROTECT THE ENVIRONMENT
Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
Examples of Baseline Inspections
! Equipment Alignment
~92 hrs/yr
! Triennial Fire Protection
~200 hrs every 3 yrs
! Operator Response
~125 hrs/yr
~80 hrs/yr
! Rad Release Controls
~100 hrs every 2 yrs
! Worker Radiation Protection ~100 hrs/yr
! Corrective Action Program ~250 hrs every 2 yrs
! Corrective Action Case Reviews ~60 hrs/yr
Performance Threshold Safety Significance Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue NRC Inspection Efforts Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Increased NRC oversight Red:
Increased NRC oversight and other NRC actions
National Summary
! Performance Indicator Results (at end of CY 2003)
Green 1825
White 15
Yellow 0
Red 0
! Total Inspection Findings (CY 2003)
Green 748
White 9
Yellow 2
Red 1
Action Matrix Concept Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee
Response
Regulatory
Response
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance
National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
- Davis-Besse is under a special restart oversight process Total Units 102*
Sequoyah Nuclear Plant 2003 Inspection Activities Approximately 5000 hours0.0579 days <br />1.389 hours <br />0.00827 weeks <br />0.0019 months <br /> of inspection related activities includes resident inspectors plus:
! Engineering modification and design inspection
! Security inspections
! Radiation protection inspections
! Problem Identification and Resolution Program
! Reactor pressure vessel lower penetration inspection
! Refueling outage and reactor head penetration inspection
! Steam Generator Replacement inspections
! Operator requalification inspection
! ISFSI construction inspection
! Supplemental inspection for unplanned scrams
! Two Event response inspections for: a Unit 1 trip in August 2003/ a security issue
Sequoyah Nuclear Plant Assessment Results January 1-December 31, 2003
! All inspection findings were classified as very low safety significance (Green)
! All PIs were Green at the end of the period for both units with the exception of Unit 2, which had white one PI (unplanned scrams per 7000 critical hours) in the initiating events cornerstone during the first half of the period
! TVA operated Sequoyah Nuclear Plant in a manner that preserved public health and safety
Sequoyah Unit 2 PI
Sequoyah Nuclear Plant Annual Assessment Summary January 1-December 31, 2003
! All cornerstone objectives were met
! We completed a supplemental Inspection in July 2003 for the white PI. The PI returned to Green in the 3rd quarter of 2003
! Plant performance was in the Licensee Response Column of the NRCs Action Matrix at the end of the period for both units.
Sequoyah Nuclear Plant 2004 Inspection Activities Additional planned inspections (outside ROP):
! NRC plans normal baseline inspections at Sequoyah for the remainder of the assessment period
! Reactor containment sump blockage inspection
! Reactor pressure vessel lower head penetration inspection
! Spent Fuel Material Control and accountability inspection
! (ISFSI) Independent Spent Fuel Storage Installation construction and testing inspections
Licensee Response and Remarks Sequoyah Nuclear Plant TVA
Contacting the NRC
! Report an emergency
(301) 816-5100 (call collect)
! Report a safety concern:
(800) 695-7403
Allegation@nrc.gov
! General information or questions
www.nrc.gov
Select What We Do for Public Affairs
Reference Sources
! Reactor Oversight Process
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
! Public Electronic Reading Room
http://www.nrc.gov/reading-rm.html
! Public Document Room
1-800-397-4209 (Toll Free)
Sequoyah Nuclear Plant Annual Assessment Meeting Reactor Oversight Process - CY 2003 Nuclear Regulatory Commission - Region II April 21, 2004