ML041060003

From kanterella
Jump to navigation Jump to search
Meeting Summary - Annual Assessment Meeting - H.B. Robinson Steam Electric Plant, Unit 2
ML041060003
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/14/2004
From: Fredrickson P
NRC/RGN-II/DRP/RPB4
To: Moyer J
Carolina Power & Light Co
Shared Package
ML041060002 List:
References
Download: ML041060003 (5)


Text

April 14, 2004 Carolina Power & Light Company ATTN:

Mr. J. W. Moyer Vice President H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

MEETING

SUMMARY

- ANNUAL ASSESSMENT MEETING - H. B. ROBINSON STEAM ELECTRIC PLANT UNIT 2, DOCKET NO. 50-261

Dear Mr. Moyer:

This refers to the open annual assessment category 1 public meeting that was conducted at our request at the Hartsville Memorial Library on March 30, 2004, to present the results of the 2003 annual assessment. The topics discussed included the reactor oversight process, the NRCs action matrix and the performance of the H.B. Robinson Steam Electric Plant Unit 2. A list of attendees and a copy of the presentation handouts are enclosed. It is our opinion that this meeting was beneficial.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact us.

Sincerely,

/RA/

Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-261 License No. DPR-23

Enclosures:

1. List of Attendees
2. NRC Presentation Handout cc w/encls: (See page 2)

2 CP&L cc w/encls:

Chris L. Burton Director, Site Operations Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution T. P. Cleary Plant General Manager Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution James W. Holt, Manager Performance Evaluation and Regulatory Affairs CPB 9 Electronic Mail Distribution C. T. Baucom, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution J. F. Lucas, Manager Support Services - Nuclear Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Henry J. Porter, Director Div. of Radioactive Waste Mgmt.

Dept. of Health and Environmental Control Electronic Mail Distribution R. Mike Gandy Division of Radioactive Waste Mgmt.

S. C. Department of Health and Environmental Control Electronic Mail Distribution Beverly Hall, Acting Director Division of Radiation Protection N. C. Department of Environment, Health and Natural Resources Electronic Mail Distribution Steven R. Carr Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution Chairman of the North Carolina Utilities Commission c/o Sam Watson, Staff Attorney Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Public Service Commission State of South Carolina P. O. Box 11649 Columbia, SC 29211 Distribution w/encls: (See page 3)

3 CP&L Distribution w/encl:

C. Patel, NRR L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE DRP/RII SIGNATURE GTM NAME GMacDonald:as DATE 04/ 14 /2004 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041060003.wpd List of Attendees NRC Attendees P. Fredrickson, Branch Chief, Division of Reactor Projects (DRP), Branch 4, Region II, (RII)

R. Hagar, Senior Resident Inspector, Robinson, DRP, RII D. Jones, Resident Inspector, Robinson, DRP, RII Licensee Attendees J. Moyer, Vice President, H. B. Robinson Nuclear Plant C. Burton, Robinson Plant Director of Site Operations T. Cleary, Robinson Nuclear Plant General Manager J. Valentino, Robinson Plant Licensing Group D. McNeill, Robinson Plant Communications Other Attendees M. Gandy, SCDHEC J. Newman, Morning News S. Hagar, Hartsville Citizen