ML041050467

From kanterella
Jump to navigation Jump to search
Public Meeting Slides, D. C. Cook 2003 End-of-Cycle Assessment
ML041050467
Person / Time
Site: Cook  
Issue date: 04/07/2004
From:
NRC/RGN-III
To:
References
Download: ML041050467 (1)


Text

D.C. Cook Annual Assessment Meeting D.C. Cook Annual Assessment Meeting Reactor Oversight Program - CY 2003 Reactor Oversight Program - CY 2003 Nuclear Regulatory Commission - Region III Nuclear Regulatory Commission - Region III Lisle, Illinois Lisle, Illinois April 7, 2004 April 7, 2004

NRC Representatives NRC Representatives

 James Caldwell, Region III Administrator

- (630) 829-9657

 Patrick Hiland, Deputy Division Director, DRP

- (630) 829-9601

 Brian Kemker, Senior Resident Inspector

- (269) 465-5353

 Eric Duncan, Branch Chief

- (630) 829-9628

Agenda

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 NRC Available to Address Public Questions

Region III Organization James Caldwell Regional Administrator Geoffrey Grant Deputy Regional Administrator Steven Reynolds Acting Director, DRP Patrick Hiland Acting Deputy Director, DRP Cynthia Pederson Director, DRS Roy Caniano Deputy Director, DRS Eric Duncan Branch Chief Regional Specialists D.C. Cook Resident Inspectors Brian Kemker Ivy Netzel Reactor Engineer Raymond Ng

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~250 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Purpose of Todays Meeting

 A public forum for discussion of the licensees A public forum for discussion of the licensees performance performance

 NRC will discuss the licensee performance NRC will discuss the licensee performance issues identified in the annual assessment letter issues identified in the annual assessment letter

 Licensee will respond to the information in Licensee will respond to the information in the letter and inform the NRC of new or the letter and inform the NRC of new or existing programs to maintain or improve their existing programs to maintain or improve their performance performance

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

National Summary

 Performance Indicator Results (at end of CY 2003)

Green 1825 White 15 Yellow 0

Red 0

 Total Inspection Findings (CY 2003)

Green 748 White 9

Yellow 2

Red 1

D.C. Cook Annual Assessment Summary January 1 - December 31, 2003

 AEP operated D.C. Cook Units 1 & 2 in a manner that preserved public health and safety. All cornerstone objectives were met.

 Unit 1 is in the Licensee Response column of the Action Matrix.

 Unit 2 is in the Degraded Cornerstone column of the Action Matrix. Two Unit 2 White performance indicators at the end of the assessment period represented a moderate degradation in safety performance. Two White findings were closed in 3Q03.

 One substantive cross-cutting issue in the Problem Identification and Resolution area remains open.

 NRC plans baseline inspections at D.C. Cook for the assessment period and a supplemental inspection to review the White performance indicators.

Safety Significant Findings or PIs

 Two Unit 2 White performance indicators in the Two Unit 2 White performance indicators in the Initiating Events cornerstone were identified during Initiating Events cornerstone were identified during the assessment period which placed Unit 2 in the the assessment period which placed Unit 2 in the Degraded Cornerstone column of the Action Matrix.

Degraded Cornerstone column of the Action Matrix.

 A White performance indicator in the Unplanned A White performance indicator in the Unplanned Scrams Per 7000 Critical Hours area was identified in Scrams Per 7000 Critical Hours area was identified in 4Q03.

4Q03.

 A White performance indicator in the Scrams With A White performance indicator in the Scrams With Loss of Normal Heat Removal area was first Loss of Normal Heat Removal area was first identified in 2Q03 and updated in 4Q03 to reflect identified in 2Q03 and updated in 4Q03 to reflect crossing the Green/White threshold in 3Q02.

crossing the Green/White threshold in 3Q02.

D.C. Cook Inspection Activities (Jan 1 - Dec 31, 2003)

(Jan 1 - Dec 31, 2003)

 Supplemental inspection for two Unit 2 White findings in the Mitigating Systems cornerstone

 Supplemental inspection for Unit 2 Scrams With Loss of Normal Heat Removal White performance indicator

 Supplemental Problem Identification and Resolution inspection

 Unit 2 Refueling Outage April-June

 Unit 1 Refueling Outage October/November

D.C. Cook Inspection Activities (Jan 1 - Dec 31, 2004)

(Jan 1 - Dec 31, 2004)

 Supplemental Inspection for two Unit 2 White Performance Indicators

 Problem Identification and Resolution Inspection

 Unit 2 Refueling Outage Inspections - Fall 2004

 License Renewal Inspections

Licensee Response and Remarks Mano Nazar Senior Vice President and Chief Nuclear Officer American Electric Power Company

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)