ML040990077

From kanterella
Jump to navigation Jump to search

Technical Specification for Point Beach Nuclear Plant, Units 1 and 2
ML040990077
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/02/2004
From:
NRC/NRR/DLPM
To:
References
FOIA/PA-2004-0282, TAC MB8223, TAC MB8224
Download: ML040990077 (1)


Text

Containment Penetrations 3.9.3.

3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status:

a.

The equipment hatch closed and held in place with all bolts;

b.

One door in each air lock is capable of being closed; 'and

c.

Each Containment Purge and Exhaust System penetration either:

1.

closed by a manual or automatic isolation valve, blind flange, or equivalent, or

2.

capable of being closed by an OPERABLE Containment Purge and Exhaust Isolation System.

APPLICABILITY:

During movement of recently irradiated fuel assemblies within containment.

I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more A.1 Suspend movement of Immediately containment recently irradiated fuel penetrations not in assemblies within required status.

containment.

Point Beach 3.9.3-1 Unit I - Amendment No. 213 Unit 2 - Amendment No. 218