,Summary of Meeting with Energy Northwest Risk Informed Diesel Generator Allowed Completion Time Extension (Tac. MA7491)
ML040960145
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/30/2004
From: Brian Benney
NRC/NRR/DLPM
To:
Benney B, NRR/DLPM, 415-3764
Shared Package
ML040970317 List:
References
TAC MA7491
Download: ML040960145 (4)


Text

March 30, 2004 LICENSEE: Energy Northwest FACILITY: Columbia Generating Station

SUBJECT:

SUMMARY

OF MARCH 16, 2004, MEETING WITH ENERGY NORTHWEST ON THE RISK-INFORMED DIESEL GENERATOR ALLOWED COMPLETION TIME EXTENSION (TAC NO. MA7491)

On March 16, 2004, representatives of Energy Northwest met with the NRC staff to discuss the risk-informed diesel generator allowed completion time extension.

Energy Northwest began the meeting by providing background information on Columbia Generating Station's onsite and offsite power distribution. Energy Northwest discussed grid stability and availability based on historical data. The meeting continued with the proposed technical specification changes. Finally, Energy Northwest discussed the probability risk assessment information that will support the amendment request.

Energy Northwest was appreciative of the staff's feedback on the submittal. The meeting concluded with the staff expressing their appreciation for the presentation.

An attendance list is provided in the enclosure. The slides and the contractor's letter used during the meeting are available in ADAMS under accession number ML040770381.

/RA/

Brian Benney, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-397

Enclosure:

Meeting Attendees cc w/encl: See next page

ML040960145 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC NAME BBenney:mp EPeyton SDembek DATE 3/29/04 3/29/04 3/30/04 DOCUMENT NAME: C:\MYFILES\Copies\3-31-04 Sum mtg w Energy Northwest.wpd Columbia Generating Station cc:

Mr. Dale Atkinson (Mail Drop PE08) Mr. Rodney L. Webring (Mail Drop PE04)

Vice President, Technical Services Vice President, Nuclear Generation Energy Northwest Energy Northwest P.O. Box 968 P.O. Box 968 Richland, WA 99352-0968 Richland, WA 99352-0968 Mr. Albert E. Mouncer (Mail Drop PE01) Thomas C. Poindexter, Esq.

Vice President, Corporate Services/ Winston & Strawn General Counsel/CFO 1400 L Street, N.W.

Energy Northwest Washington, DC 20005-3502 P.O. Box 968 Richland, WA 99352-0968 Mr. Bob Nichols Executive Policy Division Chairman Office of the Governor Energy Facility Site Evaluation Council P.O. Box 43113 P.O. Box 43172 Olympia, WA 98504-3113 Olympia, WA 98504-3172 Ms. Lynn Albin Mr. D. W. Coleman (Mail Drop PE20) Washington State Department of Health Manager, Performance Assessment P.O. Box 7827 and Regulatory Programs Olympia, WA 98504-7827 Energy Northwest P.O. Box 968 Mr. J. V. Parrish Richland, WA 99352-0968 Chief Executive Officer Energy Northwest Ms. Christina Perino (Mail Drop PE20) P.O. Box 968 (Mail Drop 1023)

Manager, Licensing Richland, WA 99352-0968 Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 69 Richland, WA 99352-0069

MEETING WITH ENERGY NORTHWEST March 16, 2004 ATTENDANCE LIST ENERGY NORTHWEST C. Perino D. Rhoads A. Chaing OTHERS B. Bradley (NEI)

D. Vanover (Exelon)

NRC B. Benney S. Dembek M. Wohl M. Drouin M. Stutzke B. Tjader G. Parry