Summary of Public Meeting to Allow Licensee to State the Basis for Request to Restart Reactor Operations at the Davis-Besse Nuclear Power Station
ML040920315
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/30/2004
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML040920315 (5)


Text

March 30, 2004 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE FEBRUARY 12, 2004, PUBLIC MEETING TO ALLOW THE LICENSEE TO STATE THE BASIS FOR REQUEST TO RESTART REACTOR OPERATIONS AT THE DAVIS-BESSE NUCLEAR POWER STATION On February 12, 2004, the Nuclear Regulatory Commission (NRC) held a public meeting at the Camp Perry Clubhouse in Port Clinton, Ohio. The meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to allow the licensee to state the basis for their request to restart reactor operations at the Davis-Besse Nuclear Power Station. The letter of notification, meeting notice, licensee presentation and transcript can be found in ADAMS as ML040300931, ML040370811, ML040430220 and ML040631105, respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

Additional documents which were presented to the NRC at the meeting can be found in ADAMS as ML040500805, Memorandum from Sandy Buchanan, Ohio Citizen Action; ML040620200, Port Clinton Area Chamber of Commerce Resolution; ML040620196, Public Comments form Congressman Dennis J. Kucinich at the Restart Hearing of the Davis-Besse Nuclear Power Plant; ML040500801, Davis-Besse Memo, Chris Redfern to Jack Grobe Regarding Davis-Besse Restart; ML040510102, Memo from Donna Lueke to NRC, FirstEnergy, Watchdog Groups, Elected Officials, Media, Local citizens.

These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA J. Grobe acting for/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040920315.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME DPassehl/ CLipa/RA J. Grobe acting for/

DATE 03/25/04 03/30/04 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

S. Arndt, President, Ottawa County Board of Commissioners C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Joe Ihnat, Jr.

INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

AJM DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure Meeting Participants NRC J. Grobe, Chairman, Davis-Besse Oversight Panel C. Lipa, Branch Chief, RIII W. Ruland, Director, Project Directorate III J. Hopkins, Project Manager, NRR A. Mendiola, Section Chief, Division of Licensing and Project Management, NRR C. Thomas, Senior Resident Inspector, Davis-Besse J. Rutkowski, Resident Inspector, Davis-Besse FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer G. Leidich, President and Chief Nuclear Officer M. Bezilla, Site Vice President B. Allen, Plant Manager F. vonAhn, Vice President, FENOC Oversight