Invitee Letters for April 12, 2004 NRC Annual Assessment Meeting for Seabrook Station
ML040890027
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/22/2004
From: James Trapp
NRC/RGN-I/DRP/PB6
To: Baddour S, Barrington J, Bridle R, Cohen B, Costello M, Francoeur S, Gillick T, Harrington N, Hildt D, Kelley J, Mccann R, Moore B, Morris R, O'Neil M, Prescott R, Small E, Stanley H, Tarr B, Weare E, Welch F
Amesbury, MA, State of MA, House of Representatives, State of MA, Senate, State of NH, House of Representative, State of NH, Senate, Town of Hampton Falls, NH, Town of Hampton, NH, Town of Salisbury, MA, Town of Seabrook, NH
Shared Package
ML040640874 List:
References
Download: ML040890027 (21)


Text

March 22, 2004 Senator Russell E. Prescott 8 Farm Road Kingston, NH 03848

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Prescott:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Senator Burton J. Cohen PO Box 208 Newcastle, NH 03854

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Cohen:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Russell D. Bridle 225 Towle Farm Road Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Bridle:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Sheila T. Francoeur 88 Kings Highway Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Francoeur:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Benjamin E. Moore 81 Railroad Avenue, Apt. 307 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Moore:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. E. Albert Weare 30 Forest Court Seabrook, NH 03874

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Weare:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Mr. James Barrington Town Manager Hampton Town Hall 100 Winnacunnet Road Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Barrington:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Mr. Eric Small Town Administrator Hampton Falls Town Office 1 Drinkwater Road Hampton Falls, NH 03844

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Small:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Mr. Fred Welch Town Manager Seabrook Town Office PO Box 456 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Welch:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Senator Steven Baddour MA State Senator State House, Room 513 Boston, MA 02133

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Baddour:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Senator Bruce E. Tarr State House, Room 313A Boston, MA 02133

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Senator Tarr:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Harriet L. Stanley State House, Room 275 Boston, MA 02133

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Stanley:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Michael A. Costello State House, Room 146 Boston, MA 02133

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Costello:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Honorable David Hildt Mayor of Amesbury Amesbury City Hall 62 Friend Street Amesbury, MA 01913

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mayor Hildt:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Mr. Neil Harrington Town Manager Town Hall 5 Beach Road Salisbury, MA 01952

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Mr. Harrington:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Richard A. McCann 67 Border Winds Avenue Seabrook, NH 03874

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative McCann:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Richard W. Morris PO Box 644 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Morris:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Thomas J. Gillick 17 R Gill Street Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Gillick:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Jane P. Kelley PO Box 1 Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative Kelley:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated

March 22, 2004 Rep. Michael ONeil PO Box 818 Hampton, NH 03842

SUBJECT:

SEABROOK STATION - ANNUAL ASSESSMENT OF SAFETY PERFORMANCE

Dear Representative ONeil:

I would like to personally invite you and other members of your organization to attend a meeting between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC in which the NRC staff will discuss with FPL our annual assessment of the safety performance of Seabrook Station.

The meeting will be held at 3:00 p.m. on Monday, April 12, 2004, at the Hampshire Inn, 20 Spur Road in Seabrook, NH. At the meeting we will briefly discuss our Reactor Oversight Process and then discuss with FPL our assessment of their safety performance of Seabrook Station and their response to our assessment. The meeting is open to the public for observation. Following the presentation, the NRC staff will be available to answer questions from you and members of the public regarding the safety performance of Seabrook Station and the role of the NRC in ensuring safe plant operations.

The NRC recently completed its annual assessment of the safety performance of the Seabrook Station in accordance with the NRC Reactor Oversight Process. Our assessment used the most recent performance indicator data and inspection findings from January 1, 2003 through December 31, 2003.

We described our assessment results in a letter to FPL on March 2, 2004. A copy of that letter is enclosed. The NRCs meeting notice, meeting agenda, and assessment letter can be found in the ADAMS meeting package (Accession Number ML040640874). ADAMS is accessible from the NRC web site at: http://www.nrc.gov/reading-rm/adams.html.

You can also become familiar with our Reactor Oversight Process, the information we used in our annual assessment, and the specific safety performance at Seabrook Station through the NRC web site. This information may be accessed at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS.index.html.

Your schedule permitting, I look forward to meeting you on April 12, 2004. In the interim, please do not hesitate to contact me at 610-337-5186 if I can be of further assistance to you.

Sincerely,

/RA/

James M. Trapp, Chief Projects Branch 6 Division of Reactor Projects

Enclosure:

As Stated