d2 J
mai ne yankee M c x t-1-i I -
N moNe 1 mI>4m= - 19aB8 I
8812290236 881209 . - -
17 PDR ADOCK 05000029 R IPDC
OPERATING DATA REPORT Docket No.: 50-309 Date: 03/Dec/88 Completed By: J. M. TAYLOR Telephone: 207-882-6321
- 1. Unit Name....................................... Maine Yankee
- 2. Reporting Period................................ November 1988
- 3. Licensed Thermal Power (MWt).................... 2630
- 4. Nameplate Rating (Gross MWe).................... 864
- 5. Design Electrical Rating (Net MWe).............. 825
- 6. Maximum Dependable Capacity (Gross MWe)......... 850
- 7. Maximum Dependable Capacity (Net MWe)........... 810
- 8. If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net MWe)
- 10. Reasons for Restrictions, if Any:
THIS MONTH YEAR-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720.00 8;040.00
- 12. Number of Hours Reactor Was Critical........... 0.00 6,777;.29 112,630.61
- 13. Reactor Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 14. Hours Generator On-line.. 0.00 6,655.71 109,410.79
- 15. Unit Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH)........ 0.00 16,488,693.00 250,849,024.00
- 17. Gross Electrical Energy Generated (MWH)........ 0.00 5,124,660.00 82.013,390.00
- 18. Net Electrical Energy Generated (MWH)........ 0.00 4,946,639.00 78,417,611.0(0
- 19. Unit Service Factor...... 0.00 82.78 77.76
- 20. Unit Availabilty Factor.. 0.00 82.78 77.76
- 21. Unit Capacity Factor (Using MDC Net)........ 0.00 75.96 70.28
- 22. Unit Capacity Factor (Using DER Net)........ 0.00 74.58 68.52
- 23. Unit Forced Outage Rate.. 0.00 3.23 7.08
- 24. Shutdowns Scheduled Over Next 6 Months:
Date Type Duration 10/15/88 REFUELING OUTAGE 8 WEEKS I
- 25. If Shutdown at End of Report Period, Estimated Date of Startup: 12/14/88
- . V Docket No: 50-309 Unit Name: Maine Yankee Date: 03/Dec/88 Completed By: K.L. Embry Telephone:. 207-882-6321 Report Month: November, 1988 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES The plant was shutdown at the beginning of the month for reactor refueling.
The plant was shutdown the entire month.
AVERAGE DAILY-UNIT POWER LEVEL FOR NOVEMBER 1988 Docket No.: 50-309 Unit: Maine Yankee Date: 03/Dec/88 Completed By: J. M. TAYLOR Telephone: 207-882-6321 Day Avg. Daily Power Level Day Avg. Daily Power Level (MWe-Net) (MWe-Net) 1 . .. .. . .............. . 0 16 .................... 0 2 . .. .. . .............. . 0 17 .................... 0 3 . . . . . . .............. . 0 18 .................... 0 4 . .. .. . .............. . 0 19 .................... 0 5 . .. .. . .............. . 0 20 .................... 0 6 . .. .. . .............. . 0 21 .................... 0 7 . .. .. . .............. . 0 22 .................... 0 8 . .. .. . .............. . 0 23 .................... 0 9 . .. .. . .............. . 0 24 .................... 0 10 . .. .. . .............. . 0 25 .................... 0 11 . .. .. . .............. . 0 26 .................... 0 12 . .. .. . .............. . 0 27 .................... 0 13 . .. .. . .............. . 0 28 .................... 0 14 . .. .. . .............. . 0 29 .................... 0 15 . .. .. . .............. . 0 30 .......................................................- 0
UNIT. SHUTDOWNS AND POWER REDUCTIONS Docket No.: 50-309 FOR NOVEMBER 1988 Unit: Maine Yankee Date: 03/Dec/88 Completed By: J. M. TAYLOR Telephone: 207-882-6321 Page: 1 of 1 Number 30-88-10 ___
Date 881014l Type (1) S i Duration I (Hours) l 720 l Reason (2) C Method (3) 1 LER# N\A System Code (4) ZZ Component Code (5) ZZZZZZ Shutdown for refueling outage Cause and Corrective Action
- 1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE:
(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure 3. METHOD: (LER) File (NUREG.0161)
B-Maintenance or Test 1-Manual C-Refueling 2-Manual Scram 5. COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above.
License Examination ft
MAINE Yk - PEOFNANCE PROGRAM WORKSHEETN ) November 1988 ktu~l PERFORMAJNCE DATA Period Hours = PH 720.0 Unit Rating WNC(Normal) = 55.0 MWe Net Unit Outage (A)Plann (B) enance C)Forced (O)Extended CE) Reserve
'ours 7°'. °. !l00 Partial (F)Unplanned (6)Seasonal l(K) Planned Planned Outsge Start Date Reduction ° 0.0 0.0 October 15,1498 ivIW-hrs:
(O Sross Sen. (Wth) (1)Net Sen. (We) Fuel Cost 0.0 0.0 158, 92. 0 CALCULgiTED DATA Service Hours SH PH - (a+b4c+d+e) = -. 720.0 0.0 Available Hours = AH = SH + e= + 0 o Equivalent Unit . C.:
5.9o Derated Hours = EUN( = (f+k) . rating Equivalent Seasonal 0.0 . 855.0 Derated Hours = ESDH = g .rating =
Thermal VXTU's = h x 3.4128 =3.412- 0.0 CALCULATED PERFOMANCE FACTORS AVAILABILITY FACTOR = AF = (Availalbe Hours - Period Hours) x 100 =
AF = (P .PH) X 100 = 0.0 720.0 x i o °° 3 EQUIVALENT AVALIBILITY FACTOR EAF Available Hours - (Equivalent Derated Hours + Equivalent Seasonal Hours) x 100=
Period Hours
- 0. 0.0- + .0 -------
EAF = PH - (EUNDH + ESEH) x 100 = xloo=_ 0.0 _
PH 720.0 CAPACITY FACTOR = CF Net Generation x 100 Period Hours x Unit Rating CF= i x 100 =_x__ _-_ 0.0 '.'
PH x Rating FORCED OUTAKE RATE = FOR Forced Outace Hours x 100 ForMJ Outage hours + Service Hours FOR C x 100,= _ _0.0 _ _ _ x100 0.0 C + SH t 2 UNIT HEAT RATE HR Fuel Energy Consumed (KvIth) x Conversion (BTU)=
F Net Generation (File) 0.0 :
j1 HR = KBTU's i
,: g0.O t.4JX 0.0 BTU-g 0.0q Pmar-__d D .3 ___
Prooar-*d bv: Date Lpg
Maine Yankee Atomic Power Co.
AVERAGE DAILY POWER LEVEL (MWTH)
A E.
1 P C R
A G
E 1
T H
C i 9 17 25 3 11 19 27 4 2 20 28 5 13 21 21 7 15 23 31i8 18 24 :;l, DATE
,.j Form No. 20-304-4 Rev. No._ _ _
Revised:
MAINE YANKEE MONTH November 1988 LOAD REDUCTION TIME DURATION ITIME I I TIME I ITIME I TIME I I TOTALI I START I % I STAB- I % I START I STAB- I % I TIME I DAY I DOWN IPWR I ILIZED IPWR I UP I ILIZED IPWR I (HRS) I REASON 1 1 1 1 0000 10 1 I I The plant was shutdown for the 2 I . I I I I I I entire month for reactor refuel-3 I I I I I I I I ing.
4 1 6
71 I I I I .I 8 1 I I I I1 9 I I I I I I I I I 10 1 I I I I I I I I 11 1 1 1 1 1 1 1 1 12 1 I I I I I I II 13 1 1 14 I I I . I 151 16 II II I I 17 1 I I I II II 18 1 I I I I I I 19 I 1. 1 1 1 1 1 1I 20 I I III I 21 II II II II 22 I I I I I I I I 23 1 24 1 I I I I I I 25 I I I I I II 26 I II III II 27 1 28 1 I I I I I I I I 29 I I I .I I I I .
30 1 I I I I I I I I 0020n
Form No. 20-304-5
~-J Rev. No. 0 Revised:
MONTH November 1988 OUTAGE & AVAILABILITY TIMES I TIME I TIME I TIME I TIME I TIME I TIME I I RX I RX I RX NOT I RX I UNIT I UNIT I DlAY II RRPA-qO s
ISUBCRII CRIT. I AVAIL. I AVAIL. IOFFGRII PHASED I a
1 I The plant was shutdown for the I I I 2 1 entire month for reactor reftieling. I I I I 43 1 1 1 I I I I S 1I I I I I I I I 651 1 1 I
7 1 I I 1 1 I 1 8 1 I 1 I 1 1 1 I 9 1 II I I I I I I 101 12 1 I 1 . IIII 13 1 1 I I I I I 14 1 1 1 I I I I I 16 1 1 1 II 17 1 I I I I 18 1 I I I I III 19 1 I 1 1 1 1 1 20 1 1 1 I I III 21 1 1 I IIII 22 1 I I 1 1 1 1 23 1 1 1 1 1 1 24 1 25 1 I I IIIII 26 1 1 1 I 1 1 27 1 28 1 1 1 1 1 I1 29 1 I 1 I 1 1 if 30 0020n
<-/
MAINE YANKEE ATOMIC POWER COMPANY
- -- WISCASSET ,MAINE-MONTHLY REPORT FOR NOV. 1988 ChO
- EET ~ --. MONTH--------)ARATE" GROSS ELECTRIC GENERATION (MWH) 0.o0 5124660.0 82013390.0 STATION SERVICE (AUX. TRANS.) (MWH) 1 19 0.0 0 720 3 0 0 367828.00 STTI?~V~E~T7TAN7V(M H)~0-.O0 1-'78021.-00S-5595782T-00 NET ELECTRIC GENERATION (MWH) 0.o0 0 4946639.00 78417611.00 ON LINL TIME (HOURS) 0.00 6655.73 109410.78 S U T D'O'QNT I'M E'-( HO UR'S)-~20 O1 8 2 3 76 5 PLANT CAPACITY FACTOR (DESIGN NET) 0.000 74.58 68.52
- PLANT PERFORMANCE LOG *MONTH YEAP seCoc.
NET PLANT HEAT RATE (8TU/KWH) 0.00 11373.80 10912.61 PLANT THERMAL CAPACITY (PERCENT) 0.000 77.978 70.097 K MYCKoRIL A N A VA1CX6flrTY (P-Ek~ER 'Ti _-0 0o 8.5 ;-~4847 84 .46-7 PLANT AVAILABIL17Y (PERCENT) 0.000 82.783 77.757
- NUCLEAR LGG* MONTH YEAR TO DATE STARTUPS 0 3 179 H-EATUPS 0 0 40 COOLDOWNS 0 1 40 SHUTDOWNS 0 4 176
_FUCU'tO'XaORE5JE`CTIO NS 0 AVERAGE CORE BURNUP (MWD/TON) 0.000 84359020 12666.051*
S.C.O. VALUE FROM THE. START OF COMMLRCIAL OPERATIONt 12/28/1972 AT 0000
...-;VALUEFOR 4 THE' PRESENT CORE
MAINE YANKEE ATOMIC POWER - DAILY NUMBERS LOG NOV. 1988 MWTH = MEGAWATT THERMAL HOURS CD COOLDOWNS RA = REACTOR AVAILABLE TIME HU HEATUPS l-C' -'=-TIME CRITICAL IN HOURS .--
`FLR- FULL LOAD REJECTIONS --
SD = SHUTDOWNS MWTHPC MEGAWATT THERMAL HOURS FOR PRESENT CORE SU = STARTUPS BURNPC BURNUP FOR PRESENT CORE S I='SCRAMS . EFPHTD EQUIVALENT FULL POWER HOURS TO-DATE
'- 'DATE TH RA ' - TC' SU SD - S -- CD."' ' HU ' FLR MWT PC.' BU'NPC-
- 'EF D 11/ 1/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/ 2/1988 0.0 0 *0 0' 0 0 0 0 0 24759471.0 12666.1 97898.0 11/ 3/1988 0.lb0 0.*0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/ 4/1988 0.*0 0- 00 0.0
-0 0 0 0 0 0 0 24759471.0
'11I/- 12666.1 97898.u 5/198'8- " 0.0o . 0 0 0 0 0 0- 24759471.0- 12666.1 97898.0 11/ 6/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 11/ 97898.0 7/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/ 8/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.U 11/ 9/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/10/1988 . 0.0. 0.0 0.0 0 0 0 0 _ 0 0 24759471.0 12666.1 97898.0 I 1 1/9 8 0;0 0.0 0.0 0 0 0 0 - 0 0 24759471.0 12666.1 97898.0 11/12/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.U 11/16/1988 o.U 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/14/1988 0.O 0.0 0 .0 0 0 0 0 0 0 24759471.0 '12666.1 97898.0 11/15/1988 0.0 0.0 00 0 0 0 0 0 0 24759471.0 12666.1 973-',o 11/16/1988 0.0 0. 0 0 0 0 0 0 24759471.0 12666.1 97 io.
11/17/1988 0.0 0.0 0 0 0 ' 0 '0 0 0 24759471.0- '12666.1 97898.0 11/18/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/19/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/20/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0' 12666.1 97898.0 11/21/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/22/1988 . 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 11/23/1988- 97898.0 0.0 0.0 0.0 0 '" 0 0 0. 247594'71'.0-12666.1 99789'8.'O 11/24/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 978918.U 11/25/1988 0.0 b.0 0.0 0 0 0 U 0 0 24759471.U 12666.1 97898.0 11/26/1988 '0.0' 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/21/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/28/1988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 11/29/1988 0.0 0.0 U.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 llS/01988 0.0 0.0 0.0 0 0 0 0 0 0 24759471.0 12666.1 97898.0 I
'I