ML040860746

From kanterella
Jump to navigation Jump to search
Monthly Status Report for November 1988
ML040860746
Person / Time
Site: Maine Yankee, WM-00011
Issue date: 12/09/1988
From:
Maine Yankee Atomic Power Co
To:
Shared Package
ML040860742 List:
References
-RFPFR NUDOCS 8812290236
Download: ML040860746 (11)


Text

J d2 mai ne yankee M c x t-1-i I -

N moN 1 e mI>4m=

- 19a B8 I

17 8812290236 881209.

PDR ADOCK 05000029 R

IPDC

OPERATING DATA REPORT Docket No.:

Date:

Completed By:

Telephone:

50-309 03/Dec/88 J. M. TAYLOR 207-882-6321 1.

2.

3.

4.

5.

6.

7.

8.

Unit Name.......................................

Reporting Period................................

Licensed Thermal Power (MWt)....................

Nameplate Rating (Gross MWe)....................

Design Electrical Rating (Net MWe)..............

Maximum Dependable Capacity (Gross MWe).........

Maximum Dependable Capacity (Net MWe)...........

If Changes in Capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES Maine Yankee November 1988 2630 864 825 850 810

9. Power Level to Which Restricted, if Any (Net MWe)
10. Reasons for Restrictions, if Any:

THIS MONTH YEAR-TO-DATE CUMULATIVE

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical...........
13. Reactor Reserve Shutdown Hours..................
14. Hours Generator On-line..
15. Unit Reserve Shutdown Hours..................
16. Gross Thermal Energy Generated (MWH)........
17. Gross Electrical Energy Generated (MWH)........
18. Net Electrical Energy Generated (MWH)........
19. Unit Service Factor......
20. Unit Availabilty Factor..
21. Unit Capacity Factor (Using MDC Net)........
22. Unit Capacity Factor (Using DER Net)........
23. Unit Forced Outage Rate..

720.00 8;040.00 0.00 6,777;.29 0.00 0.00 0.00 6,655.71 0.00 0.00 0.00 16,488,693.00 0.00 5,124,660.00 0.00 4,946,639.00 0.00 82.78 0.00 82.78 0.00 75.96 0.00 74.58 0.00 3.23 112,630.61 0.00 109,410.79 0.00 250,849,024.00 82.013,390.00 78,417,611.0(0 77.76 77.76 70.28 68.52 7.08

24. Shutdowns Scheduled Over Next 6 Months:

Date Type 10/15/88 REFUELING OUTAGE Duration 8 WEEKS I

25. If Shutdown at End of Report Period, Estimated Date of Startup:

12/14/88

V Docket No:

50-309 Unit Name:

Maine Yankee Date:

03/Dec/88 Completed By: K.L. Embry Telephone:.

207-882-6321 Report Month: November, 1988 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES The plant was shutdown at the beginning of the month for reactor refueling.

The plant was shutdown the entire month.

AVERAGE DAILY-UNIT POWER LEVEL FOR NOVEMBER 1988 Docket No.:

Unit:

Date:

Completed By:

Telephone:

50-309 Maine Yankee 03/Dec/88 J. M. TAYLOR 207-882-6321 Day 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 Avg. Daily Power Level (MWe-Net) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 Day 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Avg. Daily Power (MWe-Net)

Level 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

UNIT. SHUTDOWNS AND POWER REDUCTIONS FOR NOVEMBER 1988 Docket No.:

Unit:

Date:

Completed By:

Telephone:

Page:

50-309 Maine Yankee 03/Dec/88 J. M. TAYLOR 207-882-6321 1 of 1 Number 30-88-10 Date 881014l Type (1)

S i

Duration I

(Hours) l 720 l

Reason (2)

C Method (3) 1 LER#

N\\A System Code (4)

ZZ Component Code (5)

ZZZZZZ Shutdown for refueling outage Cause and Corrective Action

1. TYPE:

(F)orced (S)cheduled

2. REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training &

License Examination

2. REASON: (cont)

F-Administrative G-Operational Error H-Other (Explain)

3. METHOD:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Other (Explain)

4. SYSTEM CODE:

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG.0161)

5. COMPONENT CODE:

Exhibit I-Same source as above.

ft

MAINE Yk - PEOFNANCE PROGRAM WORKSHEETN PERFORMAJNCE DATA

) November 1988 ktu~l Period Hours = PH 720.0 Unit Rating WNC(Normal) =

55.0 MWe Net Unit Outage (A)

Plann (B) enance C) Forced (O)

Extended CE) Reserve

'ours 7°'.

°.

!l00 Partial (F)

Unplanned (6)

Seasonal l(K) Planned Planned Outsge Start Date Reduction

° 0.0 0.0 October 15,1498 ivIW-hrs:

(O Sross Sen. (Wth)

(1)

Net Sen. (We)

Fuel Cost 0.0 0.0 158, 92. 0 CALCULgiTED DATA Service Hours SH PH -

(a+b4c+d+e) =

720.0 0.0 Available Hours = AH = SH + e=

+

0 o

Equivalent Unit C.:

5.9o Derated Hours = EUN( = (f+k). rating Equivalent Seasonal 0.0 855.0 Derated Hours = ESDH = g.rating =

Thermal VXTU's = h x 3.4128 =3.412-0.0 CALCULATED PERFOMANCE FACTORS AVAILABILITY FACTOR = AF = (Availalbe Hours - Period Hours) x 100 =

AF = (P.PH) X 100 =

0.0 720.0 x

i o °° 3

EQUIVALENT AVALIBILITY FACTOR EAF Available Hours -

(Equivalent Derated Hours + Equivalent Seasonal Hours) x 100=

Period Hours

0.

0.0

+

.0 EAF = PH -

(EUNDH + ESEH) x 100 =

xloo=_

0.0 _

PH 720.0 CAPACITY FACTOR = CF Net Generation x 100 Period Hours x Unit Rating CF=

i x 100 =_x__

0.0 PH x Rating FORCED OUTAKE RATE = FOR Forced Outace Hours x 100 ForMJ Outage hours + Service Hours FOR C x 100,=

_0.0 x100 0.0 C + SH t

UNIT HEAT RATE HR F

Fuel Energy Consumed (KvIth) x Conversion (BTU)=

Net Generation (File) 0.0 HR = KBTU's g0.O 0.0 BTU -

i

, j1 t.4JX g

0.0q Pmar-__d

.3 D

Prooar-*d bv:

Date Lpg 2

Maine Yankee Atomic Power Co.

AVERAGE DAILY POWER LEVEL (MWTH)

A E

1.

P RA GE 1

TH C

C i 9 17 25 3 11 19 27 4 2 20 28 5 13 21 21 7 15 23 31i8 18 24 :;l, DATE

,.j Form No. 20-304-4 Rev. No._ _ _

Revised:

MAINE YANKEE LOAD REDUCTION TIME DURATION ITIME I I TIME I

ITIME I TIME I

I TOTALI I START I % I STAB-I % I START I STAB-I % I TIME I

DAY I DOWN IPWR I ILIZED IPWR I UP I ILIZED IPWR I (HRS) I MONTH November 1988 REASON 1

1 1

1 0000 10 1

I I

The plant was shutdown for the 2

I I

I I

I I

I entire month for reactor refuel-3 I

I I

I I

I I

I ing.

4 1 6

71 I

I I

I I

8 1 I

I I

I 1 9 I I

I I

I I

I I

I 10 1 I

I I

I I

I I

I 11 1

1 1

1 1

1 1

1 12 1 I

I I

I I

I II 13 1

1 14 I

I I

I 151 16 II II I

I 17 1

I I

I II II 18 1 I

I I

I I

I 19 I

1.

1 1

1 1

1 1I 20 I I

III I

21 II II II II 22 I

I I

I I

I I

I 23 1 24 1 I

I I

I I

I 25 I

I I

I I

I I 26 I II III II 27 1

28 1 I

I I

I I

I I

I 29 I I

I

. I I

I I

30 1

I I

I I

I I

I I

0020n

Form No. 20-304-5

~-J Rev. No. 0 Revised:

MONTH November 1988 OUTAGE & AVAILABILITY TIMES DlAY I

I TIME I TIME I TIME I TIME I TIME I TIME I I

RX I RX I RX NOT I RX I UNIT I UNIT I ISUBCRII CRIT. I AVAIL. I AVAIL. IOFFGRII PHASED I RRPA-qO I

s a

1 I The plant was shutdown for the I

I I

2 1 entire month for reactor reftieling. I I

I I

43 1 1

1 I

I I

I S 1 I I

I I

I I

I I

651 1

I 1

7 1 I

I 1

I 1

1 8 1 I

1 I

1 1

1 I

9 1 II I

I I

I I

I 101 12 1 I

1 IIII 13 1 1

I I

I I

I 14 1 1

1 I

I I

I I

16 1 1

1 I I 17 1 I

I I

I 18 1 I

I I

I III 19 1 I

1 1

1 1

1 20 1 1

1 I

I III 21 1 1

I IIII 22 1 I

I 1

1 1

1 23 1 1

1 1

1 1

24 1

25 1 I

I IIIII 26 1 1

1 I

1 1

27 1

28 1 1

1 1

1 I 1 29 1 I

1 I 1 1

30 if 0020n

<-/

MAINE YANKEE ATOMIC POWER COMPANY WISCASSET

,MAINE-MONTHLY REPORT FOR NOV. 1988

  • EET ChO

~

MONTH--------)ARATE" GROSS ELECTRIC GENERATION (MWH) 0.o0 5124660.0 82013390.0 STATION SERVICE (AUX. TRANS.) (MWH) 1 19 0.0 0 720 3 0 0 367828.00 STTI?~V~E~T7TAN7V(M H)~0-.O0 1-'78021.-00S-5595782T-00 NET ELECTRIC GENERATION (MWH) 0.o0 0 4946639.00 78417611.00 ON LINL TIME (HOURS) 0.00 6655.73 109410.78 S U T D'O'QNT I'M E'-( HO UR'S)-~20 O1 8

2 3

76 5

PLANT CAPACITY FACTOR (DESIGN NET) 0.0 00 74.58 68.52

  • PLANT PERFORMANCE LOG
  • MONTH YEAP seCoc.

NET PLANT HEAT RATE (8TU/KWH) 0.00 11373.80 10912.61 PLANT THERMAL CAPACITY (PERCENT) 0.000 77.978 70.097 K MYCKoRIL A N A VA 1CX6f lrTY (P-Ek~ER 'T i

_-0 0o 8.5 ;-~4847 84.46-7 PLANT AVAILABIL17Y (PERCENT) 0.000 82.783 77.757

  • NUCLEAR LGG*

MONTH YEAR TO DATE STARTUPS 0

3 179 H-EATUPS 0

0 40 COOLDOWNS 0

1 40 SHUTDOWNS 0

4 176

_FUCU'tO'XaORE5JE`CTIO NS 0

AVERAGE CORE BURNUP (MWD/TON) 0.000 84359020 12666.051*

S.C.O.

VALUE FROM THE. START OF COMMLRCIAL OPERATIONt 12/28/1972 AT 0000

... 4

-;VALUEFOR THE' PRESENT CORE

MAINE YANKEE ATOMIC POWER -

DAILY NUMBERS LOG NOV.

1988 MWTH = MEGAWATT THERMAL HOURS CD RA

= REACTOR AVAILABLE TIME HU l-C' -'=-TIME CRITICAL IN HOURS

`FLR-SD

= SHUTDOWNS MWTHPC SU

= STARTUPS BURNPC S

I='SCRAMS EFPHTD COOLDOWNS HEATUPS FULL LOAD REJECTIONS MEGAWATT THERMAL HOURS FOR PRESENT CORE BURNUP FOR PRESENT CORE EQUIVALENT FULL POWER HOURS TO-DATE

'- 'DATE TH RA TC' SD

SU S -- CD."' '

HU

' FLR

MWT PC.'

BU'NPC-

- 'EF D

11/

1/1988 11/ 2/1988 11/ 3/1988 11/ 4/1988

'11I/- 5/198'8- "

0.0 0.0o 0.0 0.0 0.0 0

  • 0 0.lb0 0.*0 0.*0 0.0 0- 00

-0 11/ 6/1988 0.0 0.0 0.0 11/ 7/1988 0.0 0.0 0.0 11/ 8/1988 0.0 0.0 0.0 11/ 9/1988 0.0 0.0 0.0 11/10/1988 0.0.

0.0 0.0 I 1 1/ 9 8 0;0 0.0 0.0 11/12/1988 0.0 0.0 0.0 11/16/1988 o.U 0.0 0.0 11/14/1988 0.O 0.0 0.0 11/15/1988 0.0 0.0 00 11/16/1988 0.0 0.

11/17/1988 0.0 0.0 0

11/18/1988 0.0 0.0 0.0 11/19/1988 0.0 0.0 0.0 11/20/1988 0.0 0.0 0.0 11/21/1988 0.0 0.0 0.0 11/22/1988.

0.0 0.0 0.0 11/23/1988-0.0 0.0 0.0 11/24/1988 0.0 0.0 0.0 11/25/1988 0.0 b.0 0.0 11/26/1988

'0.0' 0.0 0.0 11/21/1988 0.0 0.0 0.0 11/28/1988 0.0 0.0 0.0 11/29/1988 0.0 0.0 U.0 llS/01988 0.0 0.0 0.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0'

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.u 0

0 0

0 0

0-24759471.0-12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.U 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 _

0 0

24759471.0 12666.1 97898.0 0

0 0

0 -

0 0

24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.U 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0

'12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 973-',o 0

0 0

0 0

0 24759471.0 12666.1 97 io.

0 0 '

0

'0 0

0 24759471.0- '12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0' 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0 '"

0 0

0.

247594'71'.0-12666.1 9 9789'8.'O 0

0 0

0 0

0 24759471.0 12666.1 978918.U 0

0 0

U 0

0 24759471.U 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 0

0 0

0 0

0 24759471.0 12666.1 97898.0 I

'I