Morning Report 3-2004-0024: Davis-Besse Reactor Plant Is Critical
ML040860241
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/26/2004
From:
NRC/RGN-III
To:
References
MR 3-2004-0024
Download: ML040860241 (1)


Text

PRIORITY ATTENTION REQUIRED MORNING REPORT -

REGION III March 26, 2004 050-00346 Licensee/Facility:

Dockets:

[1] B&W-L-LP Notification:

MR Number: 3-2004-0024 Date:

03/26/2004 RIII-Via Teleconf. with Site License No:

Akron, Ohio Davis-besse FIRSTENERGY NUCLEAR OPERATING CO.

Subject:

Davis-Besse Reactor Plant is Critical Discussion:

This information is current as of 9:00 a.m. (EST) on March 26, 2004. Davis-Besse completed its maintenance outage to repair feed water and steam line turbine bypass valves and recommenced start-up activities. The plant is currently in Mode 2 at normal operating temperature and pressure. The plant entered Mode 2 at 3:07 a.m. this morning, March 26, achieved criticality at 4:56 a.m., and is continuing with power ascension activities.

Ongoing resident inspector coverage, and enhanced inspection oversight will continue to be utilized to evaluate operational evolutions. Around-the-clock oversight, with NRC resident inspector and examiner support from Region III and other Regional Offices, was re-initiated on March 25 at 4:00 p.m., and will continue during operational evolutions until full power routine operations are achieved.

Regional Action:For Information Only