Transmittal of Turkey Point Units 3 & 4, Fourth-10 Year Interval Inservice Inspection (ISI) Program
ML040860092
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2004-046
Download: ML040860092 (1)


Text

/I J

PW3L L-2004-046 10 CFR 50.55a(g)

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Fourth-10 Year Interval Inservice Inspection (ISI) Program The Fourth 10-Year Inservice Inspection Interval for Turkey Point Unit 3 begins on February 22, 2004 and ends on February 21, 2014, and for Unit 4 begins on April 15, 2004 and ends on April 14 2014.

Pursuant to 10 CFR 50.55a(g)(4)(ii) the enclosed program outlines the ISI program, plan and schedule for Turkey Point Units 3 and 4 based on the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1998 Edition with Addenda though 2000. provides a copy of the ISI program. Relief Requests 1 and 2 associated with the Turkey Point Units 3 and 4 Fourth 10-Year Interval ISI program are submitted herein for your review and approval. The Relief Requests are presented in Appendix B of Enclosure 1.

The Fourth 10 year Interval Risk Informed Inservice Inspection Program Relief Requests for Units 3 and 4 for Class 1 piping welds will be submitted for your review under a different correspondence.

Enclosures 2 and 3 contain the Turkey Point Unit 3 and Unit 4 Inspection Plan and Schedule, respectively.

If you have any questions please contact Walter Parker at (305) 246-6632.

Sincerely, Terry. I ines Vice President Turkey Point Nuclear Plant Enclosures cc:

Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant