- 0I FPL MAR 1 1 2y L-2004-053 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry nes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company i
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 03/02/2004 Linda Tudor (305) 246-6408 Reporting Period February. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693
/_=
=
Month Year-to-date No. of hours reactor was critical 696 4
4.
No. of hours generator was on line (service hours) 696 Unit reserve shutdown hours 0
Net Electrical Energy (MWH)
J 501570 1042628 l 131847273 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Llcense Examination F - Administrative G -Operational Error (Explain)
H -Other 1 - Manual 2 - Manual Trip/Scram 3 -Automatic TriptScram 4 - Continuation 5 - Other (Explain)
Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of February 2004.
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 03/02/04 Linda Tudor (305) 246-6408 Reporting Period February. 2004 Design Electrical Rating (MWe-Net) 720_IT-__
Maximum Dependable Capacity (MWe-Net) 693_
Month Year-to-date Cumulative No. of hours reactor was critical 696 1440 200859.8 No. of hours generator was on line (service hours) 696 1440 196418.4 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 502854 1044133 129565701 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A NA N/A (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)
H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 -Continuation 5 - Other (Explain)
Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February 2004.