Text

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry nes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company i

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 03/02/2004 Linda Tudor (305) 246-6408 Reporting Period February. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693

/_=

=

Month Year-to-date No. of hours reactor was critical 696 4

4.

No. of hours generator was on line (service hours) 696 Unit reserve shutdown hours 0

Net Electrical Energy (MWH)

J 501570 1042628 l 131847273 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Llcense Examination F - Administrative G -Operational Error (Explain)

H -Other 1 - Manual 2 - Manual Trip/Scram 3 -Automatic TriptScram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of February 2004.

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 03/02/04 Linda Tudor (305) 246-6408 Reporting Period February. 2004 Design Electrical Rating (MWe-Net) 720_IT-__

Maximum Dependable Capacity (MWe-Net) 693_

Month Year-to-date Cumulative No. of hours reactor was critical 696 1440 200859.8 No. of hours generator was on line (service hours) 696 1440 196418.4 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 502854 1044133 129565701 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A NA N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 -Continuation 5 - Other (Explain)

Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February 2004.