L-2004-053, February 2004 Monthly Operating Report for Turkey Point, Units 3 and 4
| ML040830707 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/11/2004 |
| From: | Jones T Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-2004-053 | |
| Download: ML040830707 (3) | |
Text
- 0I MAR 1 1 2y FPL L-2004-053 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry nes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company i
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 03/02/2004 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period February. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 /_= =
Month Year-to-date No. of hours reactor was critical 696 4 4.
No. of hours generator was on line (service hours) 696 Unit reserve shutdown hours 0 Net Electrical Energy (MWH) J 501570 1042628 l 131847273 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic TriptScram D - Regulatory Restriction 4 - Continuation E - Operator Training/Llcense Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of February 2004.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 03/02/04 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period February. 2004 Design Electrical Rating (MWe-Net) 720_IT-__
Maximum Dependable Capacity (MWe-Net) 693_ ----
Month Year-to-date Cumulative No. of hours reactor was critical 696 1440 200859.8 No. of hours generator was on line (service hours) 696 1440 196418.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 502854 1044133 129565701 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A NA N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February 2004.
Text
- 0I MAR 1 1 2y FPL L-2004-053 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - February 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the February 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry nes Vice President Turkey Point Plant LDT Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
an FPL Group company i
DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 03/02/2004 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period February. 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 /_= =
Month Year-to-date No. of hours reactor was critical 696 4 4.
No. of hours generator was on line (service hours) 696 Unit reserve shutdown hours 0 Net Electrical Energy (MWH) J 501570 1042628 l 131847273 UNIT SHUTDOWNS (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic TriptScram D - Regulatory Restriction 4 - Continuation E - Operator Training/Llcense Examination 5 - Other (Explain)
F - Administrative G -Operational Error (Explain)
H -Other Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of February 2004.
DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 03/02/04 COMPLETED BY: Linda Tudor TELEPHONE: (305) 246-6408 Reporting Period February. 2004 Design Electrical Rating (MWe-Net) 720_IT-__
Maximum Dependable Capacity (MWe-Net) 693_ ----
Month Year-to-date Cumulative No. of hours reactor was critical 696 1440 200859.8 No. of hours generator was on line (service hours) 696 1440 196418.4 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 502854 1044133 129565701 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A NA N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)
F - Administrative G - Operational Error (Explain)
H - Other Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of February 2004.