FINAL SUBMITTAL
HARRIS EXAM
50-40012004-301
-
FEBRUARY 23 27,2004
& MARCH 4,2004 (WRITTEN)
MATERIALS PROVIDED TO SRO APPLICANTS FOR WRITTEN
EXAM
1. Steam Tables
7
I . ,401-018 Attachlent 1 Sheet 2 of 2
3 OP- 141 Attachment 5
4. Curves H-X-15 a / b k
5. Curve 11-2
Attachment 1
Sheet 2 of 2
Reactor Coolant Pump Trip Limits
r---- ~ _ ~ ..~
~
NOTE
.
ALB-51-28, RCP THERM BAR HDR LOW FLOW, indicates loss of CCW to all RCP
--
-.
-
1 4. Loss of RCP seal injection when ANY of the following conditions exist:
CCW flow is lost to the associated RCP Thermal Barrier HX
temperature is greater than 105°F
RCS temperature is less than 400°F AND CCW HX outlet temperature is greater
than 120°F
I] 5. RCP vibration in excess of the following: IA.11
20milsshaft
I 5 mils shaft and increasing greater than 2 millhr
- 5 mils frame
For A and C RCPs ONLY: 3 mils frame and increasing greater than 0.2 millhr
- For t3 RCP ONLY: 3.5 mils frame and increasing greater than 5.2 rnilsihr
1 6. RCP Motor current fluctuations of 40 amps peak-to-peak:
_ . ~ . r
.______^
Motor Current IBC0160 IRC0161 IRC0162
.
- 7. LQSSof CCW to an RCP or RCP Motor when:
S
LA-21
0 Isolation of CCW to an RCP is necessary to slop excessive CCW System
leakage
-- END OF ATTACHMENT f _-
Attachment 5
Sheet 1 of 1
Cooling Tower Cold Weather Operation
60
50
40 .~ ~
I
32
30
-30 -20 -10 0 10 20 30 32 40 51)
AMBIENT AIR TEMPERATURE (DEGREES F)
NORMAL OPERATION COOLING TOWER DEICING GATE VALVES OPEN
~
AS Is -COOLING TOWER DEICING GATE VALVES REMAIN AS IS
r~I HALF OPEN- GOOLING TOWER OEICINGGATEVALVES HALF OPEN
a ABNORMAL OPERATION- NO CONDENSER HEATLOADAREA IN THIS AREA PERFORM SECTION 8 6
Q
(D