ML040760774

From kanterella
Jump to navigation Jump to search
Initial JPM Outlines for the Kewaunee Initial Examination - February 2004
ML040760774
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/02/2004
From: Lanksbury R
NRC/RGN-III/DRS/OLB
To: Coutu T
Nuclear Management Co
References
50-305/04-301
Download: ML040760774 (6)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Kewaunee Nuclear Power Plant__

Date of Examination: _02/02/04_

Examination Level (circle one): RO / SRO Operating Test Number: _2004301_

Administrative Topic/Subject Description Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions A.1 Conduct of Operations Startup Requirements JPM: Review ECP Calculations (K/A = 2.1.23)

Conduct of Operations Plant Parameter Verification JPM: Review a Manual QPTR (K/A = 2.1.33)

A.2 Equipment Control Tagging and Clearances JPM: Review a Tagout for Accuracy (K/A = 2.2.13)

A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)

Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)

A.4 Emergency Plan ED Duties JPM: Potassium Iodide Distribution (K/A = 2.4.38)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Kewaunee Nuclear Power Plant__

Date of Examination: _02/02/04_

Examination Level (circle one): RO / SRO Operating Test Number: _2004301_

Administrative Topic/Subject Description Describe method of evaluation:

1. ONE Administrative JPM, OR
2. TWO Administrative Questions A.1 Conduct of Operations Startup Requirements JPM: Perform ECP Calculations (K/A = 2.1.23)

Conduct of Operations Plant Parameter Verification JPM: Perform a Manual QPTR (K/A = 2.1.33)

A.2 Equipment Control Tagging and Clearances JPM: Review a Tagout for Accuracy (K/A = 2.2.13)

A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)

Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)

A.4 Emergency Plan Emergency Notifications JPM: Perform Emergency Notifications - LOOP (K/A = 2.4.15)

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__

Date of Examination: _02/02/04_

Exam Level (circle one): RO / SRO(I) / SRO(U)

Operating Test No.: _2004301_

B.1 Control Room Systems System / JPM Title Type Code*

Safety Function

a. Nuclear Instrumentation / Place an Excore NIS Channel Out of Service.

D, S 7

b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.

N, A, S, L 1

c. A.C. Electrical Distribution / Shift Bus 5 From TAT to RAT.

M, A, S 6

d. Component Cooling Water System / Isolate the Seal Water Heat Exchanger.

N, A, S 8

e. Pressurizer Pressure Control System / Loss of Secondary Heat Sink.

D, S, L 3

f. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.

M, S, L 2

g. Containment Spray System / Secure Containment Spray Pumps.

M, S, L 5

B.2 Facility Walk-Through

a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.

M, R, L 4

b. Emergency Diesel Generators / Locally Operate B Diesel Generator.

D, A, L 6

c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.

N, L 3

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__

Date of Examination: _02/02/04_

Exam Level (circle one): RO / SRO(I) / SRO(U)

Operating Test No.: _2004301_

B.1 Control Room Systems System / JPM Title Type Code*

Safety Function

a. Nuclear Instrumentation / Place an Excore NIS Channel Out of Service.

D, S 7

b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.

N, A, S 1

c. A.C. Electrical Distribution / Shift Bus 5 From TAT to RAT.

M, A, S 6

d. Component Cooling Water System / Isolate the Seal Water Heat Exchanger.

N, A, S 8

e. Pressurizer Pressure Control System / Loss of Secondary Heat Sink.

D, S, L 3

f. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.

M, S, L 2

g. Containment Spray System / Secure Containment Spray Pumps.

M, S, L 5

B.2 Facility Walk-Through

a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.

M, R, L 4

b. Emergency Diesel Generators / Locally Operate B Diesel Generator.

D, A, L 6

c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.

N, L 3

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA

ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__

Date of Examination: _02/02/04_

Exam Level (circle one): RO / SRO(I) / SRO(U)

Operating Test No.: _2004301_

B.1 Control Room Systems System / JPM Title Type Code*

Safety Function

a. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.

M, S, L 2

b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.

N, A, S 1

c.

d.

e.

f.

g.

B.2 Facility Walk-Through

a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.

M, R, L 4

b. Emergency Diesel Generators / Locally Operate B Diesel Generator.

D, A, L 6

c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.

N, L 3

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA