ML040760774
| ML040760774 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 02/02/2004 |
| From: | Lanksbury R NRC/RGN-III/DRS/OLB |
| To: | Coutu T Nuclear Management Co |
| References | |
| 50-305/04-301 | |
| Download: ML040760774 (6) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Kewaunee Nuclear Power Plant__
Date of Examination: _02/02/04_
Examination Level (circle one): RO / SRO Operating Test Number: _2004301_
Administrative Topic/Subject Description Describe method of evaluation:
- 2. TWO Administrative Questions A.1 Conduct of Operations Startup Requirements JPM: Review ECP Calculations (K/A = 2.1.23)
Conduct of Operations Plant Parameter Verification JPM: Review a Manual QPTR (K/A = 2.1.33)
A.2 Equipment Control Tagging and Clearances JPM: Review a Tagout for Accuracy (K/A = 2.2.13)
A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)
Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)
A.4 Emergency Plan ED Duties JPM: Potassium Iodide Distribution (K/A = 2.4.38)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Kewaunee Nuclear Power Plant__
Date of Examination: _02/02/04_
Examination Level (circle one): RO / SRO Operating Test Number: _2004301_
Administrative Topic/Subject Description Describe method of evaluation:
- 2. TWO Administrative Questions A.1 Conduct of Operations Startup Requirements JPM: Perform ECP Calculations (K/A = 2.1.23)
Conduct of Operations Plant Parameter Verification JPM: Perform a Manual QPTR (K/A = 2.1.33)
A.2 Equipment Control Tagging and Clearances JPM: Review a Tagout for Accuracy (K/A = 2.2.13)
A.3 Radiation Control Radiation Control Requirements Question #1: Radiological Controlled Area Entry Requirements (K/A = 2.3.1)
Question #2: High Radiation Area Entry Requirements (K/A = 2.3.1)
A.4 Emergency Plan Emergency Notifications JPM: Perform Emergency Notifications - LOOP (K/A = 2.4.15)
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__
Date of Examination: _02/02/04_
Exam Level (circle one): RO / SRO(I) / SRO(U)
Operating Test No.: _2004301_
B.1 Control Room Systems System / JPM Title Type Code*
Safety Function
- a. Nuclear Instrumentation / Place an Excore NIS Channel Out of Service.
D, S 7
- b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.
N, A, S, L 1
- c. A.C. Electrical Distribution / Shift Bus 5 From TAT to RAT.
M, A, S 6
- d. Component Cooling Water System / Isolate the Seal Water Heat Exchanger.
N, A, S 8
- e. Pressurizer Pressure Control System / Loss of Secondary Heat Sink.
D, S, L 3
- f. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.
M, S, L 2
- g. Containment Spray System / Secure Containment Spray Pumps.
M, S, L 5
B.2 Facility Walk-Through
- a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.
M, R, L 4
- b. Emergency Diesel Generators / Locally Operate B Diesel Generator.
D, A, L 6
- c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.
N, L 3
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__
Date of Examination: _02/02/04_
Exam Level (circle one): RO / SRO(I) / SRO(U)
Operating Test No.: _2004301_
B.1 Control Room Systems System / JPM Title Type Code*
Safety Function
- a. Nuclear Instrumentation / Place an Excore NIS Channel Out of Service.
D, S 7
- b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.
N, A, S 1
- c. A.C. Electrical Distribution / Shift Bus 5 From TAT to RAT.
M, A, S 6
- d. Component Cooling Water System / Isolate the Seal Water Heat Exchanger.
N, A, S 8
- e. Pressurizer Pressure Control System / Loss of Secondary Heat Sink.
D, S, L 3
- f. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.
M, S, L 2
- g. Containment Spray System / Secure Containment Spray Pumps.
M, S, L 5
B.2 Facility Walk-Through
- a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.
M, R, L 4
- b. Emergency Diesel Generators / Locally Operate B Diesel Generator.
D, A, L 6
- c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.
N, L 3
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA
ES-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: __Kewaunee Nuclear Power Plant__
Date of Examination: _02/02/04_
Exam Level (circle one): RO / SRO(I) / SRO(U)
Operating Test No.: _2004301_
B.1 Control Room Systems System / JPM Title Type Code*
Safety Function
- a. Emergency Core Cooling System / Transfer to Containment Sump Recirculation.
M, S, L 2
- b. Chemical and Volume Control / Perform an Emergency Boration due to a Loss of IRPI Indication.
N, A, S 1
c.
d.
e.
f.
g.
B.2 Facility Walk-Through
- a. Heat Removal from the Reactor Core / Locally Operate the Steam Generator B PORV.
M, R, L 4
- b. Emergency Diesel Generators / Locally Operate B Diesel Generator.
D, A, L 6
- c. Pressurizer Pressure Control / RCS Depressurization from the Dedicated Shutdown Panel.
N, L 3
- Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA