ML040760705

From kanterella
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Oyster Creek Generating Station
ML040760705
Person / Time
Site: Oyster Creek
Issue date: 03/09/2004
From: Swenson C
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-04-20060, GL-97-002
Download: ML040760705 (2)


Text



t--

P--

AmerGen SM AmerGen Energy Company, LLC Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 www.exeloncorp.com An Exelon Company GL 97-02 March 9, 2004 2130-04-20060 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

Subject:

Monthly Operating Report - February 2004 Enclosed is the February 2004 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02 If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.

C. N. Swenson Vice President, Oyster Creek Generating Station CNS/DIF Enclosure cc:

H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 04002

- --. 2,.,q

k

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-219 Oyster Creek 1 March 08, 2004 David I Fawcett (609) 971-4284 REPORTING PERIOD:

February 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 696.00 696.00 0.00 441,925.00 Yr-to-Date 1,440.00 1,440.00 0.00 910,204.00 Cumulative 219,877.02 215,635.65 918.20 123,304,957.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

During February, Oyster Creek generated 441,925 net MWh electric, which was 102.6% of its MDC rating.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 2 of 2