Reply to Notice of Violation Dated January 28, 2004
ML040760137
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/15/2004
From: Ring M
Reactor Projects Branch 1
To: Kanda W
FirstEnergy Nuclear Operating Co
References
EA-03-197
Download: ML040760137 (4)


Text

March 15, 2004 EA 03-197 Mr. William R. Kanda Vice President - Nuclear, Perry FirstEnergy Nuclear Operating Company P. O. Box 97, A210 10 Center Road Perry, OH 44081

SUBJECT:

PERRY NUCLEAR POWER PLANT REPLY TO NOTICE OF VIOLATION DATED JANUARY 28, 2004

Dear Mr. Kanda:

This acknowledges receipt of your letter dated February 27, 2004, in response to our letter dated January 28, 2004, transmitting a Notice of Violation involving the failure of an emergency service water pump.

We have reviewed the corrective actions as described in your letter, and we have no further questions at this time. Your corrective actions will be examined during a future inspection using Inspection Procedure 95002 in accordance with the Action Matrix (Exhibit 5) of NRC Manual Chapter 0305. In our Annual Assessment Letter for the Perry Nuclear Power Plant dated March 4, 2004, we informed you of our plans to conduct the Inspection Procedure 95002 Supplemental Inspection in May 2004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Mark A. Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 See Attached Distribution

DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040760137.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME RLerch/trn MRing DATE 03/12/04 03/15/04 OFFICIAL RECORD COPY

W. Kanda cc w/encl:

G. Leidich, President - FENOC K. Cimorelli, Acting Director, Maintenance Department V. Higaki, Manager, Regulatory Affairs J. Messina, Director, Nuclear Services Department T. Lentz, Director, Nuclear Engineering Department T. Rausch, Plant Manager, Nuclear Power Plant Department M. OReilly, Attorney, First Energy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health

W. Kanda ADAMS Distribution:

AJM DFT SPS1 RidsNrrDipmIipb GEG HBC RJP C. Ariano (hard copy)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 HBC