ML040701158

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Entergy Nuclear Operations, Inc. Re Annual Assessment Meeting with Entergy to Discuss Nrc'S Assessment of the Safety Performance of the Vermont Yankee Nuclear Power Station for Calendar Year 2003
ML040701158
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 03/10/2004
From: Anderson C
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML040620017 List:
References
Download: ML040701158 (4)


Text

MN No. 04-13 March 10, 2004 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Vermont Yankee Nuclear Power Station Docket No.: 50-271 Date/Time: March 31, 2004 at 7:00 p.m.

Location: Vernon Elementary School 381 Governor Hunt Road Vernon, VT 05354

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss NRCs assessment of the safety performance of the Vermont Yankee Nuclear Power Station for calendar year 2003. NRCs assessment is documented in a letter dated March 2, 2004.

Attendees*:

NRC: B. Holian, Deputy Director Division of Reactor Projects, Region I W. Ruland, Director, Project Directorate III, Nuclear Reactor Regulation C. Anderson, Chief Projects Branch 5, Region I D. Pelton, Senior Resident Inspector at Vermont Yankee B. Sienel, Resident Inspector at Vermont Yankee R. Ennis, Project Manager for Vermont Yankee, Nuclear Reactor Regulation A. McMurtray, Project Manager for Power Uprate, Nuclear Reactor Regulation D. Florek, Senior Project Engineer, Region I N. Sheehan, Public Affairs Officer, Region I Licensee: Jay K. Thayer, Site Vice President Kevin Bronson, General Manager of Plant Operations John Dreyfuss, Director of Engineering Robert Wanczyk, Director of Nuclear Safety.

Public Participation: This is a Category 1 Meeting. The public is invited to observe the business portion of the meeting between the NRC and Entergy. After the business portion, but before the meeting is adjourned, the public will have an opportunity to communicate with the NRC regarding Entergys performance at Vermont Yankee and the role of the agency in ensuring safe plant operations. NRC staff will be available to discuss a variety of issues including the status of NRCs review of Entergys power uprate request.

2 NRCs assessment letter and meeting agenda can be found in the ADAMS Meeting package (Accession Number ML040620017). ADAMS is accessible for the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html Additional information relative to the NRCs Annual Assessment process and the safety performance of Vermont Yankee Nuclear Power Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Additional information brochures and fact sheets that relate to the Reactor Oversight Process, Public Involvement in the Regulatory Process, Power Uprates for Nuclear Plants, and others can be found on the NRCs web site at: http://www.nrc.gov/public-involve/brochures.html Meeting

Contact:

Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 26, 2004, via telephone to the NRC meeting contact.

/RA/

Approved by: _______________________

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

3 Distribution:

Mr. Jay Thayer, Site Vice President C. Anderson, DRP D. Florek, DRP D. Pelton, SRI - Vermont Yankee B. Sienel, RI - Vermont Yankee R. Junod, DRP Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

State of Vermont, SLO Designee

4 Distribution (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

R. Ennis, Project Manager, NRR T. Tate, NRR (Backup)

W. Lanning, DRS R. Crlenjak, DRS Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

K. Farrar, Regional Counsel J. Jolicoeur, RI EDO Coordinator D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA C. Anderson, DRP D. Florek, DRP D. Pelton, SRI - Vermont Yankee B. Sienel, RI - Vermont Yankee G. Matakas, ORA PMNS WEBWORK DOCUMENT NAME: G:\BRANCH5\MEETINGS\VY EOC Meeting Notice 3-31-04.wpd After declaring this document An Official Agency Record it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'53 5,'53   

1$0( ')ORUHN') &$QGHUVRQ&$

'$7(     

2)),&,$/5(&25'&23<