Category:License-Operator
MONTHYEARML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2752015-01-13013 January 2015 Initial Exam 2014-302 General Correspondence ML15013A2712015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative JPMs ML15013A2672015-01-13013 January 2015 Initial Exam 2014-302 Final Sim_IN-Plant JPMs ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A5232015-01-0808 January 2015 December 2014 - Shearon Harris Generic Fundamentals Examination Results IR 05000400/20143022014-12-30030 December 2014 NRC Operator License Examination Report 05000400/2014302 ML14338A0362014-12-0303 December 2014 302 Final RO Written Exam ML14338A0382014-12-0303 December 2014 302 Final SRO Written Exam ML14262A3262014-09-18018 September 2014 Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML14090A4552014-03-31031 March 2014 301 Retake Final Administrative Documents 2022-09-14
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2752015-01-13013 January 2015 Initial Exam 2014-302 General Correspondence ML15013A2712015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative JPMs ML15013A2672015-01-13013 January 2015 Initial Exam 2014-302 Final Sim_IN-Plant JPMs ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A5232015-01-0808 January 2015 December 2014 - Shearon Harris Generic Fundamentals Examination Results IR 05000400/20143022014-12-30030 December 2014 NRC Operator License Examination Report 05000400/2014302 ML14338A0382014-12-0303 December 2014 302 Final SRO Written Exam ML14338A0362014-12-0303 December 2014 302 Final RO Written Exam ML14262A3262014-09-18018 September 2014 Notification of Change in Licensed Operator Initial Examination 05000400/2014302 Date RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-06-0303 June 2014 Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML14090A4552014-03-31031 March 2014 301 Retake Final Administrative Documents ML14090A4572014-03-31031 March 2014 301 Retake Final Admin JPMs ML14090A4562014-03-31031 March 2014 301 Retake Final Simulator In-plant JPMs ML14090A4522014-03-31031 March 2014 301 Retake Draft Admin JPMs ML14090A4452014-03-31031 March 2014 301 Retake Draft Sim In-plant JPMs ML14090A4392014-03-31031 March 2014 301 Retake Draft Administrative Documents 2022-09-14
[Table view] |
Text
Administrative Dscuments (Yellow Paper)
HARRIS EXAM 50-40012002-302 OPERATING TEST)
NOVEMBER 21,2002 Exam Preparation Checklist . . . . . . . . . . . . . . . . . . . . ES-202 -1 Exam Outline Quality Checklist . . . . . . . . . . . . . . . . . ES-201-2 Exam Security Agreement . . . . . . . . . . . . . . . . . . . . . ES-201-3 Administrative Topics Outline (Final) . . . . . . . . . . . . . ES-301-1 Control Room Systems and Facility Walk-through Test Outline (Final) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ES-301-2 Operating Test Quality Check Sheet . . . . . . . . . . . . . ES-301-3 Simulator Scenario Quality Check Sheet . . . . . . . . . . ES-301-4 Transient and Event Checklist . . . . . . . . . . . . . . . . . . ES-302 -5 Competencies Checktist . . . . . . . . . . . . . . . . . . . . . . ES-301-6 Written Exam Quality Check Sheet . . . . . . . . . . . . . . ES-401-@(*
Written Exam Review Worksheet. . . . . . . . . . . . . . . . ES-401-9 Written Exam Grading Quality Checklist . . . . . . . . . . ES-403-1
- 13. Post-Exam Check Sheet . . . . . . . . . . . . . . . . . . . . . . ES-501-1
FS-201 Examination Preoaration Checklist Form ES-201-1 (R8.Sl)
Chief Task Rescription / Reference Examiner's Initials I . Examination administration date confirmed (C.1.a; C.2.a & b)
- 2. NRC examiners and facility contact assigned (C.1 .d; C.2.e)
- 3. Facility contact briefed on security & other requirements (C.2.c)
- 4. Corporate notification letter sent (C.2.d)
[5.Reference material due (C.1 .e; C.3.c)]
- 6. Integrated examination outline(s) due (C.1 .e & f; C.3.d) oy hRC arid leeaback prov dcd R. Proposed examindt'ons. sbppar!iny uoci:nwiitat oh,arid reference matera s due (C.1.e. 1. q & n, C.3.d)
- 9. Preliminary license applications due (C.1.I: C.2.g; ES-202)
I O . Final license a lications due and assignment sheet prepared (C.1.I; c.2.g; Z8202)
- 41. Examination ap roved by NRC supervisor for facility licensee review (C.2.h; 613.f)
- 42. Examinations reviewed with facility licensee (12.1 .j; C.2.f & h; C.3.g)
- 14. Final app!ications ruviewea; ass,gvneril sheet dpoated: walver letters sen: (C.2.g. ES-204)
- 15. Proclor ny!wrirten exam adminislralion Guide iles rev!ewed wi!h facility emsee anc autnorizat on qraritea to give wr t!en exams
( Iapnlicdb e ) !C.3 n)
- 16. Approve0 sceiianos. lob pedormance meds,res. and quesr ons d slribLled tu NHC exam ners (C 3 !
E§-201 Examination Outline Form E§-201-2 Quality Checklist Task Description I
- 3. Assess whether the justifications for desele I
- 5. Assess whether there are enough Scenario sets (and spares) to test the projected number and 1NRC examinason.
- b. Verify that:
(I)the tasks are distributed among the safety function groupings as specified in ES-301.
(2) one task is conducted in a low-power or shutdnw wndition.
131 40% of the tasks rewire the applicant to implement an altcmato path Dmedure, 1-specific priorities (including P M and IPE insights) are covered in the
- b. Facility Reviewer p)
- c. NRC Chief Examiner (#)
- d. NRC Supervisor 23 of 24 NUREG-1021, Revision 8, Supplement 1
i ES-301 Operatino Test Qualitv Checklist Form ES-301-3 2%zz=
Initials I 1. GENERAL CRITERIA Overlac x,ith the written exaniination and between oceratina test cateawies is within acceDtable initial cndtinns initiating cues rf!ferences and tools. including asswiatted procedures reasonable and validated time limits (average lime allowed for completion) and specific designation if deemed to be time critical by the facility licensee specific performnnce criteria that include:
- detailed expected actiuns with exact criteria and nomenclature
- svstern resoonse and other examiner cues p r y A are predominantly open reference and meet the
- d. At least 20 percmt of the JPMs on each test are new or significantly modified.
- 3. SIMULATOR (CATEGORY C) CRITERIA
- a. The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-3Ol-4 and a copy is attachad.
Printed Name I Signature
- a. Author
- h. Facility Reviewer(^)
- c. NRC Chief Examiner (#)
- d. NRC Supervisor 23 of 26 NUREG-1021, Revision 8, Supplement I
'AX NO, 13193623146
". I, f,'
'\.
ES-304 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Harris Nuclear Plant Date of Examination: Nov. 21, 2002 Exam Level (circle one): RQ / SRQ(1) Operating Test No.: 2002-302 B.1 Control Room Systems Safetv System I JPM Title
- a. Emergency Boration (multiple rods not fully insetteed on DASb 1 Reactor Trip) (OWA2.14)
- b. Isolate Ruptured SG MSlV will not close
~ DASb 4 (045A2.01)
Restoring the Control Room Area HVAC System to NS 2 a e.
~
Normal after a Control Room Isolation Signal (013 A4.02) d.
3.2 Facility Walk-Through
- 1. Energize a Dead Bus with a Emergency Diesel Generator Locally 1 6 (062 A2.05)
BR 8
). Emergency Makeup to Fuel Pools from Emergency (033 A2.03)
Service Water System c Type Codes: (D)irect from bank, (M)odified from bank, (N)ew. (A)lternate path, (Cjontrol oom, (S)imulator, &)ow-Power, (R)CA NUREG- 1021 Revision 8
~
22 of26