ML040630868
| ML040630868 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 11/07/2003 |
| From: | St.Pierre G Florida Power & Light Energy Seabrook |
| To: | Todd Fish NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-443/04-301, NYN-03095 | |
| Download: ML040630868 (2) | |
Text
FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 November 7,2003 Docket 50-443 NYN-03095 United States Nuclear Regulatory Commission Attn: Mr. Todd Fish, Examinerhspector 475 Allendale Road King of Prussia, PA 1 9406-1 4 1 5 Seabrook Station Submittal of Information for Operator Licensing Re-take Examinations In a letter dated September 24, 2003, FPL Energy Seabrook, LLC received a request to hrnish documentation to support the administration of Senior Reactor Operator and Reactor Operator re-take licensing examinations scheduled for the week of December 15, 2003. The letter requested the examinations and supporting reference material identified in Attachment 2 of ES-20 1, Initial Licensing Examination Process; Examination Security be furnished by November 3,2003. In a November 4,2003 telephone conversation between yourself and Mr. Tim Cassidy, Operations Training Supervisor, the date was extended to November 10,2003.
Per your request, FPL Energy Seabrook, LLC encloses the following:
ES-201-2, Examination Outline Quality Checklist ES-301-3, Operating Test Quality Checklist ES-301-4, Simulator Scenario Quality Checklist ES-301-5, Transient and Event Checklist ES-301-6, Competencies Checklist Exam Scenario #1 Exam Scenario #2 Exam Scenario #3 The information provided in the enclosure is confidential in nature and is not for release to the public.
an FPL Group company
U. S. Nuclear Regulatory Commission NYN-03095Page 2 Should you have any questions regarding this matter, please contact Mr. Daniel G. Roy, Nuclear Training Manager, at (603) 773-7602.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc (Without Enclosures):
Document Control Desk H. J. Miller, NRC Region I Administrator R.J. Conte, NRC Region I Chief V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector