ML032670674
| ML032670674 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 09/24/2003 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Warner M |
| Shared Package | |
| ML030980742 | List: |
| References | |
| Download: ML032670674 (3) | |
Text
September 24, 2003 Mr. Mark E. Warner Site Vice President c/o James M. Peschel Seabrook Station P.O. Box 300 Seabrook, NJ 03874
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - SEABROOK STATION
Dear Mr. Warner:
In a telephone conversation on September 22, 2003, Mr. Stephen Barr, Examiner/Inspector, and Mr. Ed Spader, Operations Training Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at the Seabrook facility. The inspection is planned for the week of November 17, 2003, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRCs inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations, and operating tests scheduled for the week of the inspection to the NRC by November 7, 2003. Mr.
Spader has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
Mr. Mark E. Warner The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Stephen Barr at (610) 337-5316.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No.
50-443 License No.
NPF-86 cc:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. M. Peschel, Manager - Licensing G. F. St. Pierre, Station Director - Seabrook Station R. S. Kundalkar, FPL Vice President - Nuclear Engineering D. G. Roy, Nuclear Training Manager - Seabrook Station J. Devine, Polestar Applied Technology D. Bliss, Director, New Hampshire Office of Emergency Management D. McElhinney, RAC Chairman, FEMA RI, Boston, Mass R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency Management Agency S. McGrail, Director, Massachusetts Emergency Management Agency R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts M. Metcalf, Seacoast Anti-Pollution League D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire S. Comley, Executive Director, We the People of the United States W. Meinert, Nuclear Engineer, Massachusetts Municipal Wholesale Electric company R. Shadis, New England Coalition Staff P. Brann, Assistant Attorney General M. S. Ross, Attorney, Florida Power & Light Company Office of the Attorney General Town of Exeter Board of Selectmen
Mr. Mark E. Warner Distribution w/encl: (VIA E-MAIL)
Region I Docket Room (with concurrences)
G. Dentel, SRI - NRC Resident Inspector H. Miller, RA J. Wiggins, DRA J. Jolicoeur, EDO Coordinator J. Clifford, NRR V. Nerses, PM, NRR B. McDermott, DRP K. Jenison, DRP S. Barr, DRS Examiner, DRS C. Buracker, DRS (OL Facility File)
L. Vick, HOHB, NRR DRS Files DOCUMENT NAME: G:\\OSB\\Bar/SeaRequalNov03/60DAYRPI.WPD ADAMS PKG:ML0309880742 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CBuracker SBarr RConte DATE 09/23/03 09/23/03 09/23/03 09/ /03 09/ /03 OFFICIAL RECORD COPY