Letter Sequence Other |
|---|
|
|
MONTHYEARML0305606712003-02-13013 February 2003 Technical Specifications (TS) Change 421 - Framatome Fuel Design and Storage Project stage: Request ML0311305132003-04-14014 April 2003 Amendment Request for Licenses DPR-52 & DPR-68, to Revise Two Limiting Conditions for Operation Core Thermal Limits Adjustments for Inoperable Equipment Project stage: Request ML0328106432003-10-0101 October 2003 Technical Specifications (TS) Change 445 Regarding Safety Limits Minimum Critical Power Ration (Slmcpr), Cycle 12 Operation Project stage: Request ML0333900042003-12-0505 December 2003 Request for Addtional Information Related to Revision of the Safety Limit Minimum Critical Power Ratio Project stage: Other ML0336502882003-12-19019 December 2003 (BFN) - Unit 3 - Technical Specifications (TS) Change 445 - Safety Limit Minimum Critical Power Ratio (SLMCPR) - Cycle 12 Operation - Response to Request for Additional Information (RAI) Project stage: Response to RAI ML0405802792004-02-24024 February 2004 Brown Ferry, Unit 3 Amd No. 246 Project stage: Other ML0405600652004-02-24024 February 2004 Issuance of an Amendment Regarding Cycle 12 Safety Limit Minimum Critical Power Ratio Values Project stage: Approval ML0413301512004-05-10010 May 2004 5/10/04, Browns Ferry, Unit 3, Framatome, Anp, Inc., Request for Withholding Information Project stage: Withholding Request Acceptance 2003-02-13
[Table View] |
Text
S Ls SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow
< 10% rated core flow:
THERMAL POWER shall be < 25% RTP.
2.1.1.2 With the reactor steam dome pressure > 785 psig and core flow
> 10% rated core flow:
MCPR shall be 2 1.09 for two recirculation loop operation or > 1.11 I for single loop operation.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be < 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
BFN-UNIT 3 2.0-1 Amendment No. 216-,234-,246