February 25, 2004 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) -
SUMMARY
OF REVIEW OF STEAM GENERATOR (SG) TUBE INSPECTION REPORTS FOR THE SPRING 2002 OUTAGE (TAC NO. MB9657)
Dear Mr. Venable:
By letters dated April 22, 2002, and April 10 and December 18, 2003, Entergy Operations, Inc.
(the licensee) submitted information pertaining to its 2002 SG tube inspection at Waterford 3.
The Nuclear Regulatory Commission has completed its review of inspection report and related submittals, and concludes that the licensee has provided the information required by its technical specifications and that no additional follow-up is required at this time. The staffs review of the report is attached.
If you have any questions, you may call me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/enclosure: See next page
Enclosure:
As stated
February 25, 2004 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 (WATERFORD 3) -
SUMMARY
OF REVIEW OF STEAM GENERATOR (SG) TUBE INSPECTION REPORTS FOR THE SPRING 2002 OUTAGE (TAC NO. MB9657)
Dear Mr. Venable:
By letters dated April 22, 2002, and April 10 and December 18, 2003, Entergy Operations, Inc.
(the licensee) submitted information pertaining to its 2002 SG tube inspection at Waterford 3.
The Nuclear Regulatory Commission has completed its review of inspection report and related submittals, and concludes that the licensee has provided the information required by its technical specifications and that no additional follow-up is required at this time. The staffs review of the report is attached.
If you have any questions, you may call me at (301) 415-1480.
Sincerely,
/RA/
N. Kalyanam, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-382 cc w/enclosure: See next page
Enclosure:
As stated DISTRIBUTION PUBLIC PDIV-1 r/f MMurphy RidsAcrsAcnwACRS RidsNrrDlpmLpdiv1 (RGramm)
YDiaz RidsNrrPMNKalyanam RidsOgcRp LLund RidsRgn4MailCenter (AHowell)
Accession No.:ML040570759 OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME NKalyanam DJohnson RGramm DATE 2/23/04 2/23/04 2/24/04 OFFICIAL RECORD COPY
WATERFORD STEAM ELECTRIC STATION, UNIT 3 EVALUATION OF 2002 STEAM GENERATOR TUBE INSPECTION REPORTS By letters dated April 22, 2002, and April 10 and December 18, 2003, Entergy Operations, Inc.
(the licensee) submitted information pertaining to their 2002 steam generator (SG) tube inspection at Waterford Steam Electric Station, Unit 3 (Waterford 3).
Waterford 3 has two Combustion Engineering Model 3410 SGs containing 9,350 tubes each and are designated as SG31 and SG32. These SGs have mill annealed Inconel 600 tubes.
The tube support plates are carbon steel and include full egg crates, partial egg crates, and batwings. The scope and results of the licensees inspection are described in the reports referenced above.
Based on its review of the information provided by the licensee, the Nuclear Regulatory Commission staff concludes that the information was sufficient and that no additional follow-up is required at this time. However, the staff has the following observation:
Industry experience has indicated that cracks may develop at locations where wear has been observed. As a result, rotating probe examinations performed in prior outages to identify the nature of an indication may not be indicative of the current nature of all forms of degradation that may be occurring at a specific location. It is important to know the forms of degradation affecting a tube in assessing its integrity (including sizing the degradation). If cracking can occur in wear scars at Waterford 3, rotating probe examinations may be necessary each outage to confirm that wear is the only degradation mechanism at the location of the indication.
Principal Contributor: Y. Diaz Date: February 25, 2004
July 2003 Waterford Steam Electric Station, Unit 3 cc:
Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President, Operations Support Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.
17265 River Road Killona, LA 70066-0751 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President
& Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697