Summary of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Dominion Nuclear Connecticut, Inc Representatives to Discuss the Millstone Power Station, Units 2 and 3 Licensee Renewal Application
ML040560319
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/20/2004
From: Arrighi R
Division of Regulatory Improvement Programs
To:
Arrighi RJ, NRR/DRIP/RLEP, 301-415-3936
Shared Package
ML040560323 List:
References
Download: ML040560319 (8)


Text

February 20, 2004 LICENSEE:

Dominion Nuclear Connecticut, Inc.

FACILITY:

Millstone, Units 2 and 3

SUBJECT:

SUMMARY

OF MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND DOMINION NUCLEAR CONNECTICUT, INC REPRESENTATIVES TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION On February 6, 2004, the NRC staff met with members of Dominion Nuclear Connecticut, Inc.

(the applicant) in a public meeting to discuss the license renewal application (LRA) for the Millstone Power Station, Units 2 and 3. The application was submitted by letter dated January 20, 2004. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2. A copy of the slides used by the applicant are provided as.

Mr. Russell Arrighi, NRC Lead Project Manager for the review of the Millstone LRA, provided opening remarks and introductions of meeting participants. Mr. Arrighi discussed the proposed schedule for the first portion of the LRA review. Mr. William Corbin and Mr. William Watson of Dominion Nuclear Connecticut, Inc. provided an overview of the content of the Millstone LRA.

The applicant explained the methodology used in determining consistency with NUREG-1801, Generic Aging Lessons Learned (GALL) Report, and previously approved staff positions.

/RA/

Russell J. Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423

Enclosures:

As stated cc w/encl: See next page

February 20, 2004 LICENSEE:

Dominion Nuclear Connecticut, Inc.

FACILITY:

Millstone, Units 2 and 3

SUBJECT:

SUMMARY

OF MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND DOMINION NUCLEAR CONNECTICUT, INC REPRESENTATIVES TO DISCUSS THE MILLSTONE POWER STATION, UNITS 2 AND 3 LICENSE RENEWAL APPLICATION On February 6, 2004, the NRC staff met with members of Dominion Nuclear Connecticut, Inc.

(the applicant) in a public meeting to discuss the license renewal application (LRA) for the Millstone Power Station, Units 2 and 3. The application was submitted by letter dated January 20, 2004. The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in Enclosure 2. A copy of the slides used by the applicant are provided as.

Mr. Russell Arrighi, NRC Lead Project Manager for the review of the Millstone LRA, provided opening remarks and introductions of meeting participants. Mr. Arrighi discussed the proposed schedule for the first portion of the LRA review. Mr. William Corbin and Mr. William Watson of Dominion Nuclear Connecticut, Inc. provided an overview of the content of the Millstone LRA.

The applicant explained the methodology used in determining consistency with NUREG-1801, Generic Aging Lessons Learned (GALL) Report, and previously approved staff positions.

/RA/

Russell J. Arrighi, Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423

Enclosures:

As stated cc w/encl: See next page DISTRIBUTION: See next page Accession Nos.:

1. Note to File: Licensee: Dominion Nuclear Connecticut, Inc, Re: Millstone, Units 2 & 3: ML040560319
2. Millstone Slides: ML040560327
3. Pkg: ML040560323 DOCUMENT NAME:C:\\ORPCheckout\\FileNET\\ML040560319.wpd OFFICE:

LA:RLEP PM:RLEP SC:RLEP NAME:

YEdmonds RArrighi SLee DATE:

02/20/04 02/20/04 02/20/04 OFFICIAL RECORD COPY

DISTRIBUTION: Meeting Summary between NRC and Millstone Power Station, Unit 2 and Unit 3, Dated: February 20, 2004, Accession No: ML HARD COPY RLEP RF R. Arrighi E-MAIL:

PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff V. Nerses K. Chang C. Marco D. Screnci, RI OPA Millstone Power Station, Units 2 and 3

cc:

Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terrys Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385

Millstone Power Station, Units 2 and 3 cc Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.

Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.

Rope Ferry Road Waterford, CT 06385 Mr. Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Meeting Attendance List - February 6, 2004 Name Organization Paul Aitken Dominion Nuclear Connecticut Bill Corbin Dominion Nuclear Connecticut Marc Hotchkiss Dominion Nuclear Connecticut Bill Watson Dominion Nuclear Connecticut Ben Gitnick Information Systems Laboratories Scott Newburry Information Systems Laboratories Dan Preliewicz Information Systems Laboratories Fiona Fu-Hann Wang Taiwan Power Company Russell Arrighi NRC Hans Ashar NRC Ken Chang NRC Kurt Cozens NRC Yamir Dias NRC Johnny Eads NRC John Fair NRC Tanya Ford NRC Frank Gillespie NRC Raj Goel NRC John Honcharik NRC Andrea Keim NRC T.J. Kim NRC P.T. Kuo NRC Y. C. (Renee) Li NRC Chang-Yang Li NRC Mark Lintz NRC John S. Ma NRC Kamal Manoly NRC Bob Radlinski NRC Saba Saba NRC David Shum NRC Harold Walker NRC Leon Whitney NRC MEETING BETWEEN THE NRC STAFF AND DOMINION NUCLEAR CONNECTICUT, INC.

LICENSE RENEWAL APPLICATION FOR MILLSTONE, UNITS 2 AND 3 ROCKVILLE, MARYLAND ROOM O-14B6 PROPOSED AGENDA (Times are approximate)

February 6, 2004 I.

Introduction/Opening remarks 1:30 p.m. - 1:40 p.m.

II.

Presentation of the license renewal application 1:40 p.m. - 2:10 p.m.

III.

Explanation of methodology used in determining consistency with Generic Aging Lessons Learned (GALL) and previously approved staff positions 2:10 p.m. - 3:00 p.m.

IV Public Comments 3:00 p.m. - 3:30 p.m.

V.

Adjourn 3:30 p.m.