ML040560232

From kanterella
Jump to navigation Jump to search
November 2002 Retake Exam 50-400/2002-302 Final Outline
ML040560232
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/2002
From:
Carolina Power & Light Co
To: Ernstes M
NRC/RGN-II
References
50-400/02-302
Download: ML040560232 (2)


Text

Draft Submittal (Pink Paper)

HARRIS EXAM 50-400/2002-302 OPERATING TEST)

NOVEMBER 21,2002 FINAL OUTLINE

~~ _9 E§-301 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Harris Nuclear Plant Date of Examination: Nov. 21. 2002 Exam bevel (circle one): RO I SRO(1) Operating Test No.: 2002-302 B.1 Control Room Systems System I JPM Title

a. Emergency Boration (multiple rods not fully inserted on Reactor Trip)
b. Isolate Ruptured SG MSIV will not close

~

c. Restoring the Control Room Area HVAC System to Normal after a Control Room Isolation Signal NS 1 2 (023A4.02)

B.2 Facility Walk-Through Fuel Pools from Emergency

' Type Codes: (D)irect from bank, (Mjodified from bank, (N)ew, (A)lternate path, (C)ontrol room, (S)imulator, (L)ow-Power, (R)CA NUREG- 1021. Revision 8 22 of26