November 2002 Retake Exam 50-400/2002-302 Draft Outline
ML040560227
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/21/2002
From: Barbee A
Carolina Power & Light Co
To: Ernstes M
NRC/RGN-II
References
50-400/02-302
Download: ML040560227 (4)


Text

Draft Submittal (Pink Paper)

HARRIS EXAM 50-400/2002-302 OPERATING TEST)

NOVEMBER 21,2002 Draft Outline

- ES-3Q1 Control Room Systems and Facility Walk-Through Test Outline Form ES-301-2 Facility: Bate of Examination: Nov. 21, 2002 Exam Le Operating Test No.: 2002-302

~ _ _

B. 1 Control Room Systems Type Safety Code* Function System I JPM Title WW

b. Isolate Ruptured SG MSlV will not close d.
e. I I f.

B.2 Facility Walk-Through

a. Energize a Dead Bus with a Emergency Diesel Generator Locally
b. Emergency Makeup to Fuel Pools from Emergency Service Water System 1 1 8 (033A2.03)

C

  • Type Codes: (D)irect from bank, (M)odified from bank, (N)ew, (A)lternate path, (C)ontrol

, room, (S)imulator, (h)ow-Power, (R)CA M J F U X - I 021, Revision 8 22 of 26

SERIAL: HNP-02-140 Mr. Michael E. Enistes, Region I1 United States Nuclear Regulatory Commission S a m Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 SHEAKON HARRIS NUCLEAR POWER PLANT DOCKET NO. SO-400iLICENSENO. NPF-63 SENIOR REACTOR OPERAI'OR RETAKE LICENSING EXAMINATION 50-4OOi2002-302 MATERL4LS

Dear Mr. Emstes:

Enclosed is the proposed examination outline for the reldke Senior Reac.tor Operator initial iicensing examination to be given at the Harris Nuclear Plant the week of November 18, 2002.

'This submittal complies with the requirement identified in the NRC's October 15, 2002 correspondence to furnish these materials by October 18,2002.

~.

The enclosed materials shall be withheld from public disclosure until after the examinations are complete.

Questions regarding these materials may be referred to hfr. Artie Sylvester at (919) 362-3252 or myselfat (919) 362-3313.

Siiic.erelv.

Andy F ' ! Rarbee Superintendent Operations Training Harris Nuclear Plant RTG Enclosure

. Brady (NRC Senior Resident Inspector, 11")

c: hlr. .I3 wio Enclosure Mr. Ram Subbaratnam (hRC Project Manager) wio Enclosure Mr. I.. A. Reyes (NKC Regional Administrator, Region 11) wio Enclosure

Mr. M. E. Enistes SEKIAL: IRaP-02-140 bc: (w/o Enclosure) j- Mr. L. R. Beller Mr. Ralph Mullis Mr. W. Gurganious Mr. M. G. Munroe Mr. K. N. %anis Mr. W. S. Orser Mr. James Holt Mr. B. C. Waldrep Mr. 11. L. James Mr. M. G. Wallace Ms. C. Memtt Licensing Pile(s) (2 copies)

Ms. T. M. Midgette Nuclear Records