ML040560058

From kanterella
Jump to navigation Jump to search
Meeting with Entergy Operations, Inc., Waterford, to Discuss a Finding Whose Significance Has Preliminarily Been Determined to Be Greater than Green
ML040560058
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/24/2004
From:
NRC Region 4
To:
References
EA-03-230, IR-03-007
Download: ML040560058 (5)


Text

February 24, 2004 MEETING WITH ENTERGY OPERATIONS, INC.

FACILITY: Waterford Steam Electric Station, Unit 3 DOCKET: 50-382 DATE AND TIME: March 8, 2004 1:00 p.m. (CST)

LOCATIONS: Region IV Office Division of Reactor Projects Conference Room 611 Ryan Plaza Dr., Suite 400 Arlington, Texas 76011-4005 OWFN Building Room: O3B4 11555 Rockville Pike Rockville, MD 20852-2738 PURPOSE: The purpose of the Regulatory Conference is to discuss a finding whose significance has preliminarily been determined to be greater than Green. The finding and associated apparent violation (EA-03-230) involve the failure to establish appropriate instructions and accomplish those instructions for installation of a fuel line for Train A emergency diesel generator in May 2003.

This issue is described in NRC Integrated Inspection Report Report 50-382/03-07, dated February 2, 2004 (ADAMS Accession No. ML040330908). Members of the public may also observe/participate from the Headquarters location.

CATEGORY 1: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: NRC Region IV P. Gwynn, Deputy Regional Administrator A. Howell, Director, Division of Reactor Projects (DRP)

W. Jones, Chief, Project Branch E, DRP G. Sanborn, Director, Allegation Coordination/Enforcement Staff K. Smith, Regional Counsel

ENTERGY OPERATIONS, INC. M. Hay, Senior Resident Inspector, Waterford 3 Office of Enforcement - Via Videoconference J. Dixon-Herrity, Senior Enforcement Officer Office of Nuclear Reactor Regulation - Via Videoconference G. Parry, Probabilistic Safety Assessment Branch M. Runyan, Senior Reactor Analyst N. Kalyanam, Project Manager LICENSEE J. Venable, Vice President, Operations B. Eaton, Vice President, Engineering R. Douet, General Manager, Plant Operations K. Peters, Director, Nuclear Safety Assurance R. Brian, Director, Engineering J. Holman, Manager, Safety Analysis H. Brodt, Senior Lead Engineer J. Lewis, Nuclear Auxiliary Senior Operator B. Porter, Superintendent, Maintenance G. Sen, Manager, Licensing B. Murillo, Senior Staff Engineer J. Lewis, Manager, Emergency Planning B. Lanka, Supervisor, Engineering K. Boodry, Senior Engineer MEETING CONTACT: William Jones, NRC, RIV 817/860-8147 WBJ@nrc.gov cc:

Joseph E. Venable Vice President Operations Waterford 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

ENTERGY OPERATIONS, INC. Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Manager - Licensing Manager Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Chairman Louisiana Public Service Commission P.O. Box 91154 Baton Rouge, LA 70821-9154 Director, Nuclear Safety &

Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, LA 70821-4313 Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502

ENTERGY OPERATIONS, INC. E-Mail To:

( ) NRC Attendees OEWEB S. Bogle PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT JWC1 J. Craig, Associate Director for Inspections & Programs OEMAIL D/OE RLF2 R. Franovich, NRR Enforcement Coordinator TXR T. Reis DAJ1 D. Jackson, RIV EDO Coordinator VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES JAC1, CJG RA Secretaries LAO, DLF, MJS DRP Division LMB, NLH, JLH2 DRS Division CMS, JAK, BST1 DNMS Division JLP J. Pellet, IRM LPL P. Longdo ADAMS: / Yes

  • No Initials: __WBJ_

/ Publicly Available

  • Non-Publicly Available* Sensitive / Non-Sensitive R:\_WT\2004\WT 3-8-04MN-DRP.wpd RIV:SPE:DRP/E D:ACES PAO RSLO C:DRP/E VGGaddy GFSanborn VLDricks WAMaier WBJones

/RA/ /RA/ /RA/ /RA/ /RA/

02/24/04 02/24/04 02/24/04 02/24/04 02/24/04 OFFICIAL RECORD COPY