ML040540016
| ML040540016 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities (DPR-019, DPR-025, DPR-029, DPR-030) |
| Issue date: | 02/18/2004 |
| From: | Rossbach L NRC/NRR/DLPM/LPD3 |
| To: | Crane C Exelon Generation Co, Exelon Nuclear |
| Rossbach L, 415-2863, NRR/DLPM | |
| Shared Package | |
| ML040050543 | List: |
| References | |
| TAC MB8167, TAC MB8168, TAC MB8169, TAC MB8170 | |
| Download: ML040540016 (2) | |
Text
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page I of 3)
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REOUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED
-PER TRIP REOUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REOUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Vessel Water Level-Low Low
- b. Main Steam Line Pressure-Low
- c. Main Steam Line Pressure-Timer 1.2.3 1
2 2
2 D
SR SR SR SR SR E
SR SR SR E
SR SR
.SR 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.6 3.3.6.1.7 3.3.6.1.2 3.3.6.1.4 3.3.6.1.7 3.3.6.1.2 3.3.6.1.6 3.3.6.1.7 2 -56.34 inches 2 791 psig I
S 0.280 seconds (Unit 2) s 0.236 seconds (Unit 3) s 259.2 psid (Unit 2) s 252.6 psid (Unit 3) s 200-F
- d. Main Steam Line Flow-High 1.2,.3 2 per NSL D
SR SR SR SR D
SR SR SR 3.3.6.1.1 3.3.6.1.2 3.3.6.1.4 3.3.6.1.7 3.3.6.1.5 3.3.6.1.6 3.3.6.1.7
- a. Main Steam Line Tunnel Temperature-High 1.2.3 2 per trip string
- 2.
Primary Containment Isolation
- a. Reactor Vessel Water Level-Low
- b. Drywell Pressure-High
- c.
Drywell Radiation-High 1.2.3 1,2.3 1.2,3 2
2 1
G SR SR SR SR SR G
SR SR SR F
SR SR SR SR 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.6 3.3.6.1.7 3.3.6.1.2 3.3.6.1.4 3.3.6.1.7 3.3.6.1.1 3.3.6.1.2 3.3.6.1.6 3.3.6.1.7 2 2.65 inches 1
1.94 psig s 77 R/hr (continued)
Dresden 2 and 3 3.3.6.1-5 Amendment No. 1206/198
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1.1 (page 1 of 3)
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REOUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REOUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a. Reactor Vessel Water 1.2.3 2
D SR 3.3.6.1.1 2 -55.2 inches Level-Low Low SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7
- b. Main Steam Line 1
2 E
SR 3.3.6.1.2 2 791 psig Pressure-Low SR 3.3.6.1.4 SR 3.3.6.1.7
- c. Main Steam Line 1
.2 E
SR 3.3.6.1.2 s 0.331 Pressure-Timer SR 3.3.6.1.6 seconds SR 3.3.6.1.7
- d. Main Steam Line 1.2,3 2 per D
SR 3.3.6.1.1 S 254.3 psid Flow-High MSL SR 3.3.6.1.2 SR 3.3.6.1.6 I
- e.
Main Steam Line Tunnel 1,2,3 2 per trip D
SR 3.3.6.1.5 S 198-F Temperature-High string SR 3.3.6.1.6 SR 3.3.6.1.7
- 2. Primary Containment Isolation
- a. Reactor Vessel Water 1.2,3 2
G SR 3.3.6.1.1 2 3.8 Inches Level-Low SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.1.6 SR 3.3.6.1.7
- b. Drywell Pressure-High 1.2.3 2
G SR 3.3.6.1.2 S 2.43 psig SR 3.3.6.1.4 SR 3.3.6.1.7
- c. Drywell Radiation-High 1,2,3 1
F SR 3.3.6.1.1 S 70 R/hr SR 3.3.6.1.2 SR 3.3.6.1.6 SR 3.3.6.1.7 (continued)
I Quad Cities 1 and 2 3.3.6.1-5 Amendment No.
1219/213