ML040500775

From kanterella
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Oyster Creek Generating Station
ML040500775
Person / Time
Site: Oyster Creek
Issue date: 02/15/2004
From: Swenson C
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-04-20029, GL-97-002
Download: ML040500775 (2)


Text

AmerGen SM AmerGen Energy Company. LLC Oyster Creek US Route 9 South P.O. Box 388 Forked River. NJ 08731-0388 An Exelon/British Energy Company GL 97-02 February 15,2004 2130-04-20029 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility'Operating License No. DPR-16 NRC Docket No. 50-219

Subject:

Monthly Operating Report - January 2004 Enclosed is the January 2004 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02 If any further information or assistance is needed, please contact William Stewart at 609-971-4775.

Sj y,

C. N. Swenson Vice President, Oyster Creek Generating Station CNS/WVS Enclosure cc:

H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 04002 0-4

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-219 Oyster Creek 1 February 11, 2004 W. V. Stewart (609) 971-4775 January 2004 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 650.00 619.00 This Month Yr-to-Date Cumulative

3.

Number of Hours the Reactor was Critical 744.00 744.00 219,181.02

- 4.-NunbEr-of Hours Generator 0ntli65--

-744.00 744.00 214,939.65

5. Reserve Shutdown Hours 0.00 0.00 918.20
6.

Net Electrical Energy Generated (MWHrs) 468,279.00 468,279.00 122,863,032.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

During January, Oyster Creek generated 468,279 net MWh electric, which was 101.7% of its MDC rating.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1