John A. Nakoski EDUCATION:
B.S. in Nuclear Engineering from the Pennsylvania State University (1983)
EXPERIENCE:
NRC/NRRIDLPM - Chief, Section 1, Project Directorate 11 (4/02 to present)
Supervise the activities of project managers and administrative staff for 9 power reactor sites In Region II. Lead special projects on reactorvessel head replacements, technical specification audits, mixed oxide fuels, safeguards and security, and other technical and policy issues.
NRC/NRRIDRIP - Acting Chief of Policy and Rulemaking Section B of RPRP (12101 to 4102)
Oversaw the activities of the staff responsible for rulemaking activities.
NRC/NRR/DRIP - Acting Chief of the Engineering Section of RLSB (10/01 to 12/01)
Oversaw the activities of the technical staff responsible forthe development and maintenance of the Generic Aging Lessons Learned Report and the Standard Review Plan for License Renewal.
NRC/NRR/OD - Acting Technical Assistant to the Director of NRR (7/01 to 10/01)
Provided insights and support to the Directorand Deputy Directorof NRR on national and international technical exchanges.
Provided support for development of the 2002 Regulatory Information Conference. Supported the NRC Operations Center in response to terrorist attacks.
NRC/NRR/DLPM - Senior Project Manager (1/99 to 7/01)
South Texas Project/Millstone Unit 3 - Coordinated the review of the rsk-informed exemptions to special treatment requirements at South Texas. Built consensus on policy, technical, and legal issues for these exemptions. Interacted with NRC management and staff, licensee management and staff, representative of industry organizations, and members of the public and press.
NRC/NRR/SPO - Millstone ICAVP Program Coordinator (11/96 to 3/99)
Developed the Millstone Independent Corrective Action Verification Program (ICAVP). Developed inspection program for ICAVP oversight. Directed day-to-day oversight activities. Technical Monitor forcontracts with national labs and private contractors. Participated in numerous public meetings, and interacted with State and local officials, the public and the press.
NRC/NRRiDIPM/PIPB - Reactor Operations Engineer (4193 to 11/96)
Developed the revised construction inspection program. Technical monitor for the contract with a national lab. A principal in the review of the Towers Perrin Report. A principal in the review of the Public Citizen Report.
NRC Region I - Oyster Creek Resident Inspector/Reactor Engineer (9/89 to 4/93)
Interacted with all levels of licensee organization, members of the public, the press, and local and State officials. Observed licensee performance over two operating cycles. Supported development of two reactor engineers assigned to Oyster Creek. Participated in inspection of Region I power reactor sites.
Puget Sound Naval Shipyard - Refueling Engineer/Test Engineer (7/84 to 9/89)
Directed all activities for refueling Naval nuclear reactors on 6 projects. Coordinated efforts of quality control, health physics, engineering support, and production personnel. Coordinated personnel, verified system configuration and test equipment installation. Performed system testing undercritical, pre-critical, hot and cold operations, and post-maintenance conditions.