ML040420284

From kanterella
Jump to navigation Jump to search
FEMA Region IV Final Report for the November 5-6, 2003 Full Participation Ingestion Exposure Pathway Exercise - Watts Bar Nuclear Plant
ML040420284
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/10/2004
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Scalice J
Tennessee Valley Authority
References
Download: ML040420284 (4)


Text

February 10, 2004 Tennessee Valley Authority ATTN: Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Subject:

FEMA REGION IV FINAL REPORT FOR THE NOVEMBER 5 - 6, 2003 FULL PARTICIPATION INGESTION EXPOSURE PATHWAY EXERCISE - WATTS BAR NUCLEAR PLANT

Dear Mr. Scalice:

Enclosed is the subject report for the November 5 - 6, 2003, full participation ingestion exposure pathway exercise of the offsite radiological emergency response plans site-specific to the Watts Bar Nuclear Plant. There were no Deficiencies identified; however, one Area Requiring Corrective Action (ARCA) was identified concerning the content of the initial Emergency Alert System (EAS) message.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you have any questions concerning this letter, please contact me at (404) 562-4638.

Sincerely,

/RA/

Michael E. Ernstes, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-390 License No. NPF-90

Enclosure:

FEMA Final Report - Watts Bar cc w/encl: (See page 2)

2 TVA cc w/encl:

Karl W. Singer Senior Vice President Nuclear Operations Tennessee Valley Authority Electronic Mail Distribution James E. Maddox, Vice President Engineering and Technical Services Tennessee Valley Authority Electronic Mail Distribution William R. Lagergren Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution General Counsel Tennessee Valley Authority Electronic Mail Distribution Michael J. Fecht, Acting General Manager Nuclear Assurance Tennessee Valley Authority Electronic Mail Distribution Mark J. Burzynski, Manager Nuclear Licensing Tennessee Valley Authority Electronic Mail Distribution Paul L. Pace, Manager Licensing and Industry Affairs Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution Larry S. Bryant, Plant Manager Watts Bar Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution County Executive Rhea County Courthouse 375 Church Street, Suite 215 Dayton, TN 37321-1300 County Executive Meigs County Courthouse Decatur, TN 37322 Lawrence E. Nanney, Director TN Dept. of Environment & Conservation Division of Radiological Health Electronic Mail Distribution Ann Harris 341 Swing Loop Rockwood, TN 37854 James H. Bassham, Director Tennessee Emergency Management Agency Electronic Mail Distribution

3 TVA Distribution w/encl:

M. Chernoff, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS RIDSNRRDIPMLIPB PUBLIC OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE

/RA/

/RA/

/RA/

NAME LMellen MErnstes SCahill DATE 2/10/04 2/10/04 2/10/04 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040420284.wpd