3 License/Ts Pages - Letter to Rick Muench - Wolf Creek Gen. Stn., Review of Licensee'S Copy of Facility Operating License. Tac. MC0986
ML040340335
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/28/2004
From: Donohew J
NRC/NRR/DLPM/LPD4
To:
Donohew J N, NRR/DLPM,415-1307
Shared Package
ML040330566 List:
References
TAC MC0986
Download: ML040340335 (3)


Text

(2) Technical Specifications and Environmen'tal Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. , and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Antitrust Conditions Kansas Gas & Electric Company and Kansas City Power & Light Company shall comply with the antitrust conditions delineated in Appendix C to this license.

(4) Environmental Qualification (Section 3.11. SSER #4. Section 3.11. SSER

  1. 5)*

Deleted per Amendment No. 141.

(5) Fire Protection (Section 9.5.1. SER, Section 9.5.1.8. SSER #5)

(a) The Operating Corporation shall maintain in effect all provisions of the approved fire protection program as described in the SNUPPs Final Safety Analysis Report for the facility through Revision 17, the Wolf Creek site addendum through Revision 15, and as approved in the SER through Supplement 5, subject to provisions b and c below.

(b) The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

(c) Deleted.

(6) Qualification of Personnel (Section 13.1.2. SSER#5. Section 18. SSER

  1. 1!

Deleted per Amendment No. 141.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 4,15,53,54,141

RCS Pressure, Temperature and Flow DNB Limits 3.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2 NOTE E THERMAL POWER does not have to be reduced to comply with this Required Action.

Perform SR 3.4.1.3. Prior to THERMAL POWER exceeding 50% RTP AND Prior to THERMAL POWER exceeding 75% RTP AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER reaching 2 95% RTP C. Required Action and C.1 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A or B not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1 Verify pressurizer pressure is greater than or equal to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> the limit specified in the COLR. I (continued)

Wolf Creek - Unit 1 3.4-3 Amendment No. 423, 144

.;; 4 .:.ye MAR 2 8 IM

RCS Pressure, Temperature and Flow DNB Limits 3.4.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.4.1.2 Verify RCS average temperature is less than or equal 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> to the limit specified in the COLR.

SR 3.4.1.3 Verify RCS total flow rate is >37.1x 104 gpm and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> greater than or equal to the limit specified in the COLR.

SR 3.4.1.4 - -NOTE Not required to be performed until 7 days after 2 95% RTP.

Verify by precision heat balance that RCS total flow 18 months rate is 2 37.1 x 104 gpm and greater than or equal to the limit specified in the COLR.

Wolf Creek - Unit 1 3.4-4 Amendment No. 423, 144 PA 2 8 2((2