Summary of Public Meeting with Firstenergy to Discuss the Manual Chapter 0350 Process
ML040290936
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/27/2004
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML040290936 (4)


Text

January 27, 2004 LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 19, 2003, PUBLIC MEETING TO DISCUSS THE RESULTS OF RESTART READINESS ASSESSMENT TEAM INSPECTION AND THE MANAGEMENT AND HUMAN PERFORMANCE TEAM INSPECTION On December 19, 2003, the Nuclear Regulatory Commission (NRC) held a public meeting at the Davis-Besse Administration Building in Oak Harbor, Ohio. The meeting was between the NRC Davis-Besse Oversight Panel, Restart Readiness Assessment Inspection Team, Management and Human Performance Inspection Team, and FirstEnergy Nuclear Operating Company (FENOC) to discuss the results of the Restart Readiness Assessment Team Inspection and the Management and Human Performance Team Inspection. The letter of notification, meeting notice and transcript, can be found in ADAMS as ML033500281, ML033500297, and ML040230201, respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML040290936.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME DPassehl/trn CLipa DATE 01/27/04 01/27/04 OFFICIAL RECORD COPY FirstEnergy Nuclear Operating Company cc w/encl:

The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

S. Arndt, President, Ottawa County Board of Commissioners C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Joe Ihnat, Jr.

INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

AJM DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure Meeting Participants NRC J. Grobe, Chairman, Davis-Besse Oversight Panel W. Ruland, Director, Project Directorate III C. Goodman, NRR L. Jarriel, NRR J. Persensky, RES C. Lipa, Branch Chief T. Hoeg, Senior Resident Inspector, Granville R. Skokowski, Senior Resident Inspector, Byron C. Thomas, Senior Resident Inspector, Davis-Besse G. Wilson, Senior Resident Inspector, Duane Arnold J. Zeller, Senior Resident Inspector, Vogtle J. Rutkowski, Resident Inspector, Davis-Besse J. Blake, Senior Project Manager and Senior Metallurgic Engineer, RII G. Wright, Project Engineer, RIII D. Passehl, Project Engineer, RIII J. Beck, Consultant M. Brothers, Consultant FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer J. Powers, Director, Davis-Besse Nuclear Engineering M. Bezilla, Site Vice President M. Roder, Manager, Nuclear Operations B. Allen, Plant Manager