ML033500297

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting Between NRC and Firstenergy Nuclear Operating Company to Discuss the Results of the Restart Readiness Assessment Team Inspection and the Management and Human Performance Team Inspection for Davis-Besse Power Station
ML033500297
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/16/2003
From: Christine Lipa
NRC/RGN-III/DRP/RPB4
To:
References
Download: ML033500297 (2)


Text

December 16, 2003 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Friday, December 19, 2003, 9:00 a.m. to 1:00 p.m. (EST)

Location of Meeting: Davis-Besse Administration Building Energy Education Center 5501 N. State Rt. 2 Oak Harbor, OH 43449 Purpose of Meeting: Discuss the results of Restart Readiness Assessment Team Inspection and the Management and Human Performance Team Inspection Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

J. Grobe, Chairman, Davis-Besse Oversight Panel, RIII W. Ruland, Director, Project Directorate III, Division of Licensing Project Management, NRR C. Lipa, Branch Chief, Division of Reactor Projects, RIII G. Wright, Leader, Management and Human Performance Inspection R. Skokowski, Leader, Restart Readiness Assessment Team Others as designated NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jan Strasma at 630-829-9663 by COB December 17, 2003.

Stakeholders wishing to participate via telephone may call the bridge line at (888) 769-8716. You will hear a recording and then a password prompt. Provide the pass code Davis-Besse. One hundred bridge lines will be available.

Approved by: ___/RA/________________

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects

Notice of Significant Licensee Meeting Distribution:

B. Sheron (BWS), Associate Director for Projects Licensing and Technical Review, NRR L. Marsh (LBM), Director, Division of Licensing Project Management, NRR B. Boger (BAB2), Director, Division of Inspection Program Management, NRR D. Weaver (DWW), Region III Coordinator, OEDO W. Ruland (WHR), Project Directorate, Division of Licensing and Project Management, NRR Jon Hopkins, Project Manager, Project Directorate, Division of Licensing Project Management, NRR S. Reynolds (SAR1), Acting Director, Division of Reactor Projects, RIII P. Hiland (PLH), Acting Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII R. Caniano (RJC1), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, C. Thomas DRS Branch Chiefs (JFL, DEH, RDL, KXR)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA DB0350