January 28, 2004 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE MILLSTONE POWER STATION, UNITS 2 AND 3
Dear Mr. Christian:
On January 22, 2004, the U.S. Nuclear Regulatory Commission (the staff) received Dominion Nuclear Connecticut, Inc.s application for renewal of Operating Licenses DPR-65 and NPF-49 for the Millstone Power Station, Units 2 and 3, respectively. We are currently performing an acceptance review for docketing in accordance with the requirements of 10 CFR 2.101, and will notify you of the results of our review. Should the NRC staff determine that the application is acceptable for docketing, a schedule for the review will then be provided to you.
We have enclosed for your information a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am pleased to announce the appointment of Russell J. Arrighi and Johnny H. Eads as the project managers for the safety review, and Richard Emch as the project manager for the environmental review of your license renewal application. Please forward copies of all license renewal correspondence to Mr. Arrighi. Mr. Robert Pulsifer and Mr. Victor Nerses continue to remain responsible for NRC project management of all issues other than license renewal for Millstone Units 2 and 3, respectively.
If you have any questions on this matter, please contact Mr. Russell Arrighi by telephone at 301-415-3936 or via electronic mail at rja1@nrc.gov.
Sincerely,
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No.: 50-336 and 50-423
Enclosure:
As stated cc w/enclosure: See next page
January 28, 2004 Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
RECEIPT AND AVAILABILITY OF THE LICENSE RENEWAL APPLICATION FOR THE MILLSTONE POWER STATION, UNITS 2 AND 3
Dear Mr. Christian:
On January 22, 2004, the U.S. Nuclear Regulatory Commission (the staff) received Dominion Nuclear Connecticut, Inc.s application for renewal of Operating Licenses DPR-65 and NPF-49 for the Millstone Power Station, Units 2 and 3, respectively. We are currently performing an acceptance review for docketing in accordance with the requirements of 10 CFR 2.101, and will notify you of the results of our review. Should the NRC staff determine that the application is acceptable for docketing, a schedule for the review will then be provided to you.
We have enclosed for your information a copy of the notice relating to your application that is being sent to the Office of the Federal Register for publication.
I am pleased to announce the appointment of Russell J. Arrighi and Johnny H. Eads as the project managers for the safety review, and Richard Emch as the project manager for the environmental review of your license renewal application. Please forward copies of all license renewal correspondence to Mr. Arrighi. Mr. Robert Pulsifer and Mr. Victor Nerses continue to remain responsible for NRC project management of all issues other than license renewal for Millstone Units 2 and 3, respectively.
If you have any questions on this matter, please contact Mr. Russell Arrighi by telephone at 301-415-3936 or via electronic mail at rja1@nrc.gov.
Sincerely,
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-336 and 50-423
Enclosure:
As stated cc w/enclosure: See next page DISTRIBUTION:
See next page C:\\MYFILES\\Copies\\Millstone Notice of Receipt.wpd Accession No.: ML OFFICE PM:RLEP LA:RLEP SC:RLEP-A OGC PD:RLEP NAME RArrighi MJenkins SLee CMarco PTKuo DATE 1/23/04 1/23/04 1/23/04 1/26/04 1/28/04 OFFICIAL RECORD COPY
DISTRIBUTION: Dated: January 28, 2004 Accession No.: ML HARD COPY RLEP RF R. Arrighi E-MAIL:
PUBLIC J. Craig D. Matthews F. Gillespie C. Grimes RidsNrrDe E. Imbro G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair S. Black B. Boger D. Thatcher R. Pettis G. Galletti C. Li J. Moore R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff R. Pulsifer V. Nerses C. Marco D. Screnci, RI OPA
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION DOMINION NUCLEAR CONNECTICUT, INC.
NOTICE OF RECEIPT AND AVAILABILITY OF APPLICATION FOR RENEWAL OF MILLSTONE POWER STATION, UNITS 2 AND 3 FACILITY OPERATING LICENSE NOS. DPR-65 AND NPF-49 FOR AN ADDITIONAL 20-YEAR PERIOD DOCKET NOS. 50-336 AND 50-423 The U.S. Nuclear Regulatory Commission (NRC or Commission) has received an application, dated January 20, 2004, from Dominion Nuclear Connecticut, Inc., filed pursuant to Sections 104b (Operating License No. DPR-65) and 103 (Operating License No. NPF-49) of the Atomic Energy Act of 1954, as amended, and 10 CFR Part 54, to renew the operating licenses for the Millstone Power Station, Units 2 and 3, respectively. Renewal of the license would authorize the applicant to operate each facility for an additional 20-year period beyond the period specified in the respective current operating licenses. The current operating license for the Millstone Unit 2 (DRP-65) expires on July 31, 2015, and the current operating license for Millstone Unit 3 expires on November 25, 2025. The Millstone Power Station Unit 2 is a pressurized-water reactor designed by Combustion Engineering, and Unit 3 is a pressurized-water reactor designed by Westinghouse Electric Corporation. Both units are located in Waterford, Connecticut. The acceptability of the tendered application for docketing, and other matters including an opportunity to request for a hearing, will be the subject of subsequent Federal Register notices.
Copies of the application are available for public inspection at the Commissions Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland, or electronically from the NRCs Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room under accession number ML040270166. The ADAMS Public Electronic Reading Room is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html. In addition, the application is available on the NRC web page at http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html, while the application is under review. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR Reference staff at 1-800-397-4209, extension 301-415-4737, or by email to pdr@nrc.gov.
A copy of the license renewal application for the Millstone Power Station, Units 2 and 3, is also available to local residents near the Millstone Power Station at the Waterford Public Library, 49 Rope Ferry Road, Waterford, Connecticut 06385-2806, and at the Three Rivers Community College, Thames River Campus, 574 New London Turnpike, Norwich, Connecticut 06360.
Dated at Rockville, Maryland, this 28th day of January 2004.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Pao-Tsin Kuo, Program Director License Renewal and Environmental Impacts Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation
Millstone Power Station, Units 2 and 3 cc:
Lillian M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.
Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.
Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. P. J. Parulis Manager - Nuclear Oversight Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. W. R. Matthews Senior Vice President - Nuclear Operations Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. John Markowicz Co-Chair Nuclear Energy Advisory Council 9 Susan Terrace Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Mr. G. D. Hicks Director - Nuclear Station Safety and Licensing Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. William D. Meinert Nuclear Engineer Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385
Millstone Power Station, Units 2 and 3 cc Mr. S. E. Scace Assistant to the Site Vice President Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. M. J. Wilson Manager - Nuclear Training Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. A. J. Jordan, Jr.
Director - Nuclear Engineering Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. S. P. Sarver Director - Nuclear Station Operations and Maintenance Dominion Nuclear Connecticut, Inc.
Rope Ferry Road Waterford, CT 06385 Mr. Charles Brinkman, Director Washington Operations Nuclear Services Westinghouse Electric Company 12300 Twinbrook Pkwy, Suite 330 Rockville, MD 20852 Mr. Fred Emerson Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708