December 2003 Monthly Operating Report for Oyster Creek Generating Station
ML040210704
Person / Time
Site: Oyster Creek
Issue date: 01/15/2004
From: Harkness E
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-04-20006, GL-97-002
Download: ML040210704 (2)


Text

AmerGen M AmerGen Energy Company, LLC Oyster Creek US Route 9 South P.O. Box 388 Forked River, NJ 08731-0388 An Exelon/British Energy Company GL 97-02 January 15, 2003 2130-04-20006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

Subject:

Monthly Operating Report - December 2003 Enclosed is the December 2003 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02 If any further information or assistance is needed, please contact William Stewart at 609-971-4775.

Sincerely, Ernest J. Harkness P. E.

Vice President, Oyster Creek Generating Station EJH/WVS Enclosure cc:

H. J. Miller, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 04002

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME DATE Ja COMPLETED BY W.

TELEPHONE

__6 REPORTING PERIOD:

-219 yster Creek 1 nuary 13, 2004

.V. Stewart

)9) 971-4775 December 2003

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 650.00 619.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

-5.-

Reserve Shutdown Hours-

6.

Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 744.00 8,515.92 218,437.02 744.00 8,468.45 214,195.65 0.00

-0.00

-- 918.20 - -

476,234.00 5,256,325.00 122,394,753.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

During December, Oyster Creek generated 476,234 net MWh electric, which was 103.4% of its MDC rating.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & Ucense Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)