ML040090200

From kanterella
Jump to navigation Jump to search
Full Compliance with Requirements Described in Attachment 2 of Order EA-02-261
ML040090200
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/07/2004
From: Nunn D
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-02-261
Download: ML040090200 (1)


Text

_J SOUTHERN CAUFORNIA ED ISO a An EDISON INTERNATIONALO Company Dwight E. Nunn Vice President January 7, 2004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362 ORDER MODIFYING LICENSES San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

(A) Samuel J. Collins (NRC) letter to Harold B. Ray (SCE) Issuance of Order For Compensatory Measures Related to Access Authorization",

EA-02-261 (January 7, 2003)

Gentlemen:

Reference (A) (the 'Order") requires implementation of compensatory measures to improve access authorization programs at operating power reactors, including San Onofre Nuclear Generating Station, Units 2 and 3. Southern California Edison has now achieved full compliance with the requirements described in Attachment 2 of the Order.

This letter serves as the report required by Condition III.C.2 of the Order.

Sincerely, cc: B. S. Mallett, Regional Administrator, NRC Region IV G. M. Tracy, Director, Division of Nuclear Security B. M. Pham, NRC Project Manager, San Onofre Units 2 and 3 C. C. Osterholtz, NRC Senior Resident Inspector, San Onofre Units 2 and 3 P.O. Box 128 San Clemente, CA 92674-0128 949-368-1480 Fax 949-368-1490

$ 6 5 3~~