January 8, 2004 LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse Nuclear Power Station, Unit 1

SUBJECT:

SUMMARY

OF THE DECEMBER 3, 2003, PUBLIC MEETINGS TO DISCUSS THE MANUAL CHAPTER 0350 PROCESS AT DAVIS-BESSE On December 3, 2003, the Nuclear Regulatory Commission (NRC) held two public meetings at the Oak Harbor High School in Oak Harbor, Ohio. The first meeting was between the NRC Davis-Besse Oversight Panel and FirstEnergy Nuclear Operating Company (FENOC) to discuss licensee performance and progress on the Return to Service Plan as part of the IMC 0350 Process. The meeting notice, transcript, NRC Handout including the agenda, and the FENOC presentation can be found in ADAMS as ML033090359, ML033530515, ML033350250, and ML033381060, respectively. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

The second meeting was between the NRC and members of the public. During the meeting, the NRC summarized the discussion from the earlier meeting between the NRC and FENOC.

A public question and answer session followed the summary. The meeting notice, transcript, and NRC agenda can be found in ADAMS as ML033090362, ML033530512, and ML033350256, respectively.

These documents and many others related to the reactor vessel head degradation can also be found on the NRCs website at http://www.nrc.gov/reactors/operating/ops-experience/vessel-head-degradation.html.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040081000.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME DPassehl/trn CLipa DATE 12/31/03 1/08/04 OFFICIAL RECORD COPY

FirstEnergy Nuclear Operating Company cc w/encl: The Honorable Dennis Kucinich G. Leidich, President - FENOC Plant Manager Manager - Regulatory Affairs M. OReilly, FirstEnergy Ohio State Liaison Officer R. Owen, Ohio Department of Health Public Utilities Commission of Ohio D. Lochbaum, Union Of Concerned Scientists J. Riccio, Greenpeace P. Gunter, N.I.R.S.

S. Arndt, President, Ottawa County Board of Commissioners C. Emahiser, Ottawa County Sheriff J. P. Greer, Director, Ottawa County Emergency Management Agency H. Barlos, President, Lucas County Board of Commissioners J. Telb, Lucas County Sheriff B. Halsey, Director, Lucas County Emergency Management Agency G. Adams, Village Administrator, Genoa The Honorable John Weber The Honorable Lowell C. Krumnow The Honorable Joseph Verkin The Honorable Thomas Leaser The Honorable Jack Ford The Honorable Thomas Brown The Honorable Joe Ihnat, Jr.

INPO

FirstEnergy Nuclear Operating Company ADAMS Distribution:

AJM DFT DWW Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb JLC1 GEG HBC RML2 SRI Davis-Besse DRPIII DRSIII PLB1 JRK1 DB0350

Enclosure Meeting Participants NRC J. Grobe, Chairman, Davis-Besse Oversight Panel W. Ruland, Director, Project Directorate III J. Hopkins, Project Manager, NRR C. Thomas, Senior Resident Inspector, Davis-Besse J. Rutkowski, Resident Inspector, Davis-Besse G. Wright, Project Engineer, RIII R. Baker, Reactor Engineer, RIII FirstEnergy Nuclear Operating Company L. Myers, Chief Operating Officer M. Bezilla, Site Vice President C. Price, Manager, Business Services S. Loehlein, Manager - Nuclear Quality Assessment L. Griffith, Manager, Employee Concerns Program