ML040020315

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendment No. 245, Revising Technical Specifications 3.3.4.1, 3.7.5, & 5.6.5 to Add References to Framatome Advanced Nuclear Power Analytical Methods That Will Be Used to Determine Core Operating Limits
ML040020315
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 12/30/2003
From:
NRC/NRR/DLPM
To:
References
TAC MB8434
Download: ML040020315 (5)


Text

EOC-RPT Instrumentation 3.3.4.1 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1. Turbine Stop Valve (TSV) - Closure; and
2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure

- Low.

OR

b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"

limits for inoperable EOC-RPT as specified in the COLR are made applicable; and

c. LCO 3.2.3,"LINEAR HEAT GENERATION RATE(LHGR),"

limits for Inoperable EOC-RPT as specified In the COLR are made applicable.

APPLICABILITY: THERMAL POWER > 30% RTP.

BFN-UNIT 3 3.3-30 Amendment No. 243-,245

EOC-RPT Instrumentation 3.3.4.1 ACTIONS k IflFJ I I Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Inoperable. OPERABLE status.

OR A.2 ------ NOTE ----

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B. One or more Functions B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with EOC-RPT trip capability.

capability not maintained.

OR AND B.2 Apply the MCPR and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR and LHGR limit for LHGR limit for Inoperable inoperable EOC-RPT not EOC-RPT as specified in made applicable. the COLR.

C. Required Action and C.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to < 30% RTP.

Time not met.

BFN-UNIT 3 3.3-31 Amendment No. 24,3-245

Main Turbine Bypass System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Main Turbine Bypass System LCO 3.7.5 The Main Turbine Bypass System shall be OPERABLE.

OR The following limits are made applicable:

a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," limits for an inoperable Main Turbine Bypass System, as specified Inthe COLR; and
b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"

limits for an inoperable Main Turbine Bypass System, as specified In the COLR; and

c. LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR),"

limits for an inoperable Main Turbine Bypass System, as specified in the COLR.

APPLICABILITY: THERMAL POWER > 25% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the LCO A.1 Satisfy the requirements 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> not met. of the LCO.

B. Required Action and B.1 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion POWER to < 25% RTP.

Time not met.

BFN-UNIT 3 3.7-1 7 Amendment No. 244,-245

Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.4 Monthly ODeratina Renorts Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis no later than the 15th of each month following the calendar month covered by the report.

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:

(1) The APLHGRs for Specification 3.2.1; (2) The LHGR for Specification 3.2.3; (3) The MCPR Operating Limits for Specification 3.2.2; and (4) The RBM setpoints and applicable reactor thermal power ranges for each of the setpoints for Specification 3.3.2.1, Table 3.3.2.1-1.

b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1. NEDE-2401 1-P-A, General Electric Standard Application for Reactor Fuel.
2. XN-NF-81-58(P)(A), RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model.
3. XN-NF-85-67(P)(A), Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel.
4. EMF-85-74(P)(A), RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model.
5. ANF-89-98(P)(A), Generic Mechanical Design Criteria for BWR Fuel Designs.

(continued)

BFN-UNIT 3 5.0-24 Amendment No. 212, 226, 245

EOC-RPT Instrumentation 3.3.4.1 5.6 Reporting Requirements (continued)

6. XN-NF-80-19(P)(A) Volume 1, Exxon Nuclear Methodology for Boiling Water Reactors - Neutronic Methods for Design and Analysis.
7. XN-NF-80-19(P)(A) Volume 4, Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads.
8. EMF-2158(P)(A), Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/MICROBURN-B2.
9. XN-NF-80-19(P)(A) Volume 3, Exxon Nuclear Methodology for Boiling Water Reactors, THERMEX: Thermal Limits Methodology Summary Description.
10. XN-NF-84-105(P)(A) Volume 1,XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis.
11. ANF-524(P)(A), ANF Critical Power Methodology for Boiling Water Reactors.
12. ANF-913(P)(A) Volume 1, COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses.
13. ANF-1358(P)(A), The Loss of Feedwater Heating Transient in Boiling Water Reactors.
14. EMF-2209(P)(A), SPCB Critical Power Correlation.
15. EMF-2245(P)(A), Application of Siemens Power Corporation's Critical Power Correlations to Co-Resident Fuel.
16. EMF-2361(P)(A), EXEM BWR-2000 ECCS Evaluation Model.
17. EMF-2292(P)(A), ATRIUM'-10: Appendix K Spray Heat Transfer Coefficients.

(continued)

BFN-UNIT 3 5.0-24a Amendment No. 245