Y020030214 - (Incoming) Emergency Inspection of Diablo Canyon Nuclear Power Plant
ML033640448
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/24/2003
From: Diaz N
NRC/Chairman
To: Boxer B
US SEN (Senate)
References
TAC MC1657, Y020030214
Download: ML033640448 (4)


Text

Original Due Date: 01/23/2004 Ticket Number: 020030214 Document Date: 12/24/2003 NRR Received Date: 12/30/2003 From:

TACs:

MC1657 Barbara Boxer To:

      • YELLOW ***

Niles Diaz For Signature of:

==

Description:==

Emergency inspection of the Diablo Canyon Nuclear Power Plant Routing: Dyer Borchardt Craig Sheron NRR Mailroom Case Assigned To:

G100 I OO I

Contact:

MARSH, LEDYARD (TAD) B Special Instructions:

2 to 3 page summary of licensing approach for seismic issues. Coordinate with RIV

CH UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 URMAN December 24, 2003 The Honorable Barbara Boxer United States Senate Washington, D.C. 20510 Dear Senator Boxer.

On behalf of the Nuclear Regulatory Commission (NRC), I am writing in response to your December 23, 2003, letter to me, urging that the NRC undertake an emergency inspection of the Diablo Canyon Nuclear Power Plant following the December 22, 2003, earthquake that occurred approximately 35 miles northwest of the plant in San Simeon, California. In fact, following the earthquake December 22, both Pacific Gas & Electric company and our onsite NRC resident inspectors independently conducted inspections of the plant to assess any damage.

Immediately following the first shock, our NRC resident inspectors established a direct open telephone link between the station's control room and both NRC's headquarters office in Rockville, Maryland, and the NRC Region IV office in Arlington, Texas. This line was kept open by one of the two inspectors and information concerning the station's status was continuously provided to NRC staff.

Consistent with NRC requirements, an unusual event" was declared at 11:22 a.m. PST.

This is the lowest of the four level emergency classifications prescribed by NRC regulations.

Within an hour, dozens of workers at Pacific Gas & Electric Co., (PG&E) began comprehensive examinations of the plant's foundation and of the station's structures, systems, and components to determine if they were damaged. These examinations were performed by PG&E operators and other engineering staff with extensive knowledge of the systems and components. While this work was underway, our resident inspectors performed their own independent Inspection of the station's major safety systems, the plant foundation and plant structures, systems, and components to confirm that the licensee examinations were comprehensive and thorough and to make an Independent assessment of potential damage. The NRC inspected the plant searching for broken, shifted or leaking pipes and their support braces; displaced equipment; cracks in cement walls and the plant's foundation and other signs of damage. No damage was observed by either the licensee's examinations or the NRC's inspection. As a prudent follow-up, the NRC plans additional inspections at the plant over the next several weeks. The results of these NRC inspections will be documented in an inspection report and we will send you a copy.

Diablo Canyon is constructed and licensed to withstand and operate during an earthquake more powerful than the one of December 22, 2003. In addition, as part of the original plant license, PG&E was required to implement a program to reevaluate the seismic design bases used for the Diablo Canyon Power Plant. This latest earthquake will be evaluated as part of that program.

The Honorable Barbara Boxer In addition to the actions taken In the past few days, PG&E has informed the NRC that it has formed an event review team. The team will review the actions taken by PG&E in response to the earthquake, develop lessons learned, and establish improvements If needed, for responding to these type of emergencies in the future. The NRC will closely monitor the team's activities, assess its findings and recommendations, and confirm through additional inspections that PG&E has implemented the team's findings. This inspection will also be documented in an inspection report that will be provided to you.

NRC shares your concern that nuclear power plants be operated In a safe manner to protect public health and safety. Please do not hesitate to contact me if you have any questions.

Sincerely, IRAI Nils J. Diaz

I-B.s*-.M M

12/23/03 17:02 FAX 415 56 701 BARBARA BOXER 1I002 BARBARA BOXER CALIFORNIA COH~fl7ES:

COMMeCE. 5EC4CE.

AND TRAN5PORTAION ENVIRONMENT AM PUBUC WORKS FOREIGN RELATInS 11nIited 615ttes gienatc HART SENATE OFFICE BUILDING SUITE 112 WASHINGTON, DC 20510-0505 12021 224-3553 hhPJh/botv.4ftata.0a/contnbc December 23, 2003 Nils Diaz Chairman Nuclear Regulatory Commission I White Flint N. Bldg.

11555 Rockville Pike RockvUle, MD 20852

Dear Chairman Diaz:

I am writing to you to urge that the Nuclear Regulatory Commission undertake an emergency inspection of Diablo Canyon Nuclear Power Plant. I am concerned that the 6.5 magnitude earthquake which struck the area yesterday may have caused damage to the plant that has not yet been detected.

I have been advised that a serious earthquake could cause structural damage to the underlying foundation of the plant's reactors. I request that, as part of your work, you inspect the foundation as wel as the cooling tubes and other piping in the facility.

I am sure that Californians would feel more secure knowing that the Diablo Canyon plant has been inspected. It is important to rule out any damage and therefore any increased risk that may have been caused by the earthquake.

I urge you to act quickly. We must ensure that all facilities are safe. I will contact you in the next few days.