ML033580658

From kanterella
Jump to navigation Jump to search

Duke Energy Corp, Oconee, Unit 3 - Third Ten-Year Inservice Inspection Interval, Request for Alternate (Relief Request No.03-004)
ML033580658
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 12/18/2003
From: Rosalyn Jones
Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MB9962
Download: ML033580658 (2)


Text

Duke R. A. JONES cSPowere Vice President A Duke Energy Company Duke Power 29672 / Oconee Nuclear Site 7800 Rochester Highway Seneca, SC 29672 864 885 3158 864 885 3564 fax December 18, 2003 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Duke Energy Corporation Oconee Nuclear Station, Unit 3 - Docket No. 50-287 Third Ten-year Inservice Inspection Interval Request for Alternate (Relief Request No.03-004, MB9962)

By letter of July 2, 2003, Duke Energy Corporation (Duke) submitted a Request for Alternate for the Oconee Unit 3 third 10-year -reactor vessel examination per 10 CFR 50.55a(g)(5)(iii).

Subsequent to that submittal, the NRC approved the use of Code Case N648-1 which allows use of an enhanced VT-1 inspection in lieu of an Ultrasonic Test (UT).

Duke has reviewed this Code Case and has concluded that the intent of Duke's request can be achieved by application of Code Case N648-1 to the examination for which relief had been requested.

Therefore, Duke now intends to perform the examination by applying Code Case N648-1. For that reason, the requested relief, designated Relief Request No.03-004, is no longer needed and Duke hereby withdraws the request.

Please direct any questions to R. P. Todd at (864) 885-3418.

Very t ours, Ve R nA es, Site Vice President, Oconee Nuclear Station Attachments: None www. duke-energy. corn

U. S. Nuclear Regulatory Commission Page 2 December 18, 2003 xc L. A. Reyes, Regional Administrator U.S. Nuclear Regulatory Commission, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 M. C. Shannon Senior NRC Resident Inspector Oconee Nuclear Station